My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-07-18 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2018
>
02-07-18 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 12:50:40 PM
Creation date
9/25/2018 12:50:19 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – February 7, 2018 5 <br /> <br />11. A Letter of Credit in the amount of 125 percent of the cost of materials and installation <br />for the required replacement tree plantings shall be provided prior to the issuance of a <br />Grading and Erosion Control permit. The Letter of Cred shall be valid for two full years <br />from the date of installation of the replacements trees. <br />12. The Developer shall work with the City to find alternative locations for the 101 caliper <br />inches of replacement trees off-site, or a fee in lieu of the replacement tress will be <br />required equaling the cost of materials and installation plus ten percent, as determined by <br />the City Council. <br />13. Survey monuments shall be placed and installed at all block corners, angle points, points <br />of curves in streets, and at intermediate points as shown on the Final Plat. Pipes or streel <br />rods shall be placed at the corners of each lot. <br />14. The Developer shall be required to stake metal markers along the drainage easement <br />abutting the infiltration basis and wetland with signs stating the area is a natural <br />vegetation/infiltration area and no dumping is allowed. The design of the signs shall be <br />approved by the City prior to installation. <br />15. Sewer and water for the subdivision shall be obtained by connections to the City water <br />and sewer systems. Extension of City services shall be subject to review and approval by <br />the City Engineer and all associated costs shall be the responsibility of the developer. <br />16. A grading as-built and utility as-built plan shall be provided to the City upon completion <br />of grading and utility work. <br />17. The deck on the existing single-family dwelling at 3685 New Brighton Road shall be <br />removed or modified in order to meet the side yard setback requirement and not encroach <br />on any drainage and utility easement prior to the issuance of a building permit for Lot 1 or <br />Lot 2, or the Developer shall be required to submit a cash escrow with the City to ensure <br />the removal of the deck within six (6) months from the approval of the Final Plat. <br />18. The driveway for the existing single-family dwelling at 3685 New Brighton Road shall be <br />relocated to Thom Drive prior to the issuance of a building permit for Lot 1 or Lot 2, or <br />the Developer shall be required to submit a cash escrow with the City to ensure the <br />relocation of the driveway within six (6) months from the approval of the Final Plat. <br />19. The Developer shall conform to all other City regulations. <br /> <br />City Planner Bachler reviewed the options available to the Planning Commission on this <br />matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted. <br />3. Recommend Denial <br />4. Table <br /> <br />Chair Thompson opened the floor to Commissioner comments. <br /> <br />Commissioner Lambeth asked who the developer would be for the project. <br /> <br />City Planner Bachler explained the current owner of the property was Timothy Horita and the <br />application was from Mr. Horita and Richard Kotoski, a real estate agent. He indicated Mr. <br />Horita would be the developer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.