My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-17 PTRC Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes (1999 to Present)
>
2010-2019
>
2017
>
09-19-17 PTRC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 1:00:48 PM
Creation date
9/25/2018 1:00:46 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 <br /> <br />Building a legacy – your legacy. <br />Equal Opportunity Employer | wsbeng.com <br />K:\03455-200\Admin\Presentations\Park and Trails\Meeting Minutes\PTRC September 19th Meeting Minutes.docx <br /> <br /> <br />Memorandum <br /> <br />To: Sue Polka; Sara Knoll <br /> <br />From: Steven Foss <br /> <br />Date: September 20, 2017 <br /> <br />Re: PTRC Meeting Minutes <br /> WSB Project No. 03455-200 <br /> <br /> <br />The Arden Hills Comprehensive Plan – Park and Trails chapter was presented to the PTRC on <br />Wednesday, September 19 th as well as the Johanna Marsh Park Concept Plans. The following items <br />summarize feedback obtained from the PTRC: <br /> <br />Arden Hills 2040 Comprehensive Plan – Park and Trails Report <br /> <br />The following items will be reviewed and if applicable revised: <br /> <br />· WSB to confirm whether three or four parks are planned for development within TCAAP. <br />· WSB to revise section 9.4.1 Park Renovations and upgrades to reflect feedback provided from <br />the PTRC for each of the city parks. <br />· WSB to revise table 9.1 to reflect current amenities at Valentine Park. <br />· WSB to revise Highway 96 recommended trail and crossing improvements. <br /> <br />Johanna Marsh Park Concept Plans <br /> <br />Three concept plans were presented and reviewed by the PTRC. Following discussion, the PTRC <br />identified Concept 1 – Central Node as the preferred concept. WSB to provide a cost estimate reflecting <br />the improvements provided by the preferred concept. <br />
The URL can be used to link to this page
Your browser does not support the video tag.