My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-15-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
10-15-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2018 11:19:36 AM
Creation date
10/11/2018 11:18:32 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Comprehensive Sanitary Sewer Plan <br />City of Arden Hills, MN <br />WSB Project No. 3455-20 Page 9 <br />Wastewater Flows <br />All of the wastewater flow from the City of Arden Hills is treated at the Metropolitan WWTP, and <br />any increase in wastewater flow will be treated at the Metropolitan WWTP as well. Table 5 lists <br />the projected total average wastewater flow for Arden Hills from MCES and from this Sanitary <br />Sewer Plan. Note that the projections used in this report are greater than the MCES projections <br />since they rely on flow estimates for each parcel of developable land. <br />Table 5. Total Wastewater Projections <br /> 2020 Average <br />Flow (MGD) <br />2030 Average <br />Flow (MGD) <br />2040 Average <br />Flow (MGD) <br />MCES 0.93 1.04 1.09 <br />Sanitary Sewer Plan 0.90 1.13 1.37 <br />MGD = millions of gallons per day <br />
The URL can be used to link to this page
Your browser does not support the video tag.