My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-15-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
10-15-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2018 11:19:36 AM
Creation date
10/11/2018 11:18:32 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Comprehensive Sanitary Sewer Plan <br />City of Arden Hills, MN <br />WSB Project No. 3455-20 Page 11 <br />Peak Flow Factors <br />To ensure that the sanitary sewer system is capable of handling flow fluctuations throughout the <br />day, peak flow factors are assigned based on average flows. The peak factors are provided by <br />the Metropolitan Council and are based on average flow volumes. Pipes that serve small <br />generator customers are more likely to experience large fluctuations in flows. Therefore, the <br />peak factor decreases as average flow increases. The Metropolitan Council peak flow factors <br />used in this report are shown in Figure 4 below. These factors include consideration of inflow <br />and infiltration. <br />Figure 4. MCES Peak Factors for Sanitary Sewer Design <br /> <br /> <br />0.0 <br />0.5 <br />1.0 <br />1.5 <br />2.0 <br />2.5 <br />3.0 <br />3.5 <br />4.0 <br />0 5 10 15 20 25 30MCES Peak Flow FactorAverage Flow (MGD)
The URL can be used to link to this page
Your browser does not support the video tag.