My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-15-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
10-15-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2018 11:19:36 AM
Creation date
10/11/2018 11:18:32 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Comprehensive Sanitary Sewer Plan <br />City of Arden Hills, MN <br />WSB Project No. 3455-20 Page 13 <br />Trunk Sewer Analysis <br />The estimated 2040 peak flows and subsequent remaining capacity in the City’s trunk sewer <br />lines are shown in Table 8. Trunk sewers of sub-districts served by a small network of 8-inch <br />gravity main are not included in this analysis. None of the trunk gravity sewers are expected to <br />exceed their capacity by the year 2040. <br />Table 8. Trunk Sewer Capacity Analysis <br />District Location Diameter Capacity <br />(gpm) <br />2040 Peak Flow <br />(gpm) <br />Remaining <br />Capacity (gpm) <br />LS 2 Perry Park 15" 1,120 647 473 <br />LS 5 Yard Waste Collection Site 15" 1,120 473 647 <br />LS 8 Ingerson Rd 18" 1,630 1,050 580 <br />LS 9 Ridgewood Rd 10" 520 81 439 <br />MCES 54 N Prior Ave 21" 2,250 605 1,645 <br />MCES 59 Gateway Blvd 18" 1,630 1,223 407 <br />gpm = gallons per minute <br />
The URL can be used to link to this page
Your browser does not support the video tag.