My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-22-18-EDA
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Economic Development Authority (EDA)
>
EDA Packets
>
2011-2020
>
2018
>
10-22-18-EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2018 3:44:28 PM
Creation date
10/19/2018 3:44:15 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW BUSINESS –3B <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />October 22, 2018 <br />TO: EDA Chair and Commissioners <br />Dave Perrault, City Administrator <br />FROM: Jane Kansier, City Planner <br />SUBJECT: Gateway Sign <br />Budgeted Amount: Actual Amount: Funding Source: <br />N/A N/A N/A <br /> <br />EDA Chair and Commissioners Should Consider <br />Authorization of funds to prepare a plan for a gateway sign at the southwest corner of County Road <br />F and Lexington Avenue. <br /> <br />Background <br />On June 11, 2018, the City Council approved a site plan for Primrose School at 4061 Lexington <br />Avenue. One of the conditions of approval required “The property owner shall work with City <br />staff to provide a gateway sign easement measuring approximately 27 feet by 27 feet at the <br />northeast corner of the property prior to the issuance of a final Certificate of Occupancy, <br />contingent on Xcel Energy granting consent for the gateway sign easement.” <br /> <br />Attachment A is a concept plan for the location of the gateway sign; Attachment B is an example <br />of the type of sign that could be located at the site. <br /> <br />City staff have been working with Xcel Energy for permission to encroach into the Xcel easement. <br />Before they will consider this request, Xcel requires several items for consideration (see <br />Attachment C). <br /> <br />Staff asked Bolton & Menk, Inc. to provide a high level estimate for providing some of the <br />information requested by Xcel Energy. Bolton & Menk estimates the cost would be from $3,000 <br />to $5,000 to prepare the information. The major costs would be for surveying and CAD work. <br /> <br />Discussion <br />Staff respectfully requests the EDA provide feedback and direction for this project. <br /> <br />Attachments <br />A. Concept Plan <br />B. Sign Type <br />C. Xcel Energy Easement Encroachment Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.