Laserfiche WebLink
Page 1 of 1 <br /> <br />DATE: November 13, 2018 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Dave Perrault, City Administrator <br /> <br />FROM: Sue Polka, Public Works Director/City Engineer <br /> <br />SUBJECT: Lift Station 6 – Replacement Pumps and Piping <br /> <br />Budgeted Amount: Actual Amount: Funding Sources: <br /> $65,000 $75,711 Sanitary Sewer Utility <br /> Council Should Consider <br />Authorizing the acceptance of the proposal from Electric Pump Company in the amount of $75,711.00 <br />for the pumps, piping, control panel, crane/winch and safety hatch for the rehabilitation of Lift Station <br />6. <br /> <br />Background/Discussion <br />In 2010, Public Works undertook a process to standardize the City’s 14 lift stations. Until that time, the <br />City had several different types of pumps, different controllers and different software operating the <br />controller. Through several months of evaluating different pump and controller manufacturers, <br />including site visits to two repair facilities, the Public Works Department developed a standard for all <br />lift stations. Since that process was completed, the City totally rebuilt four of our oldest lift stations <br />(#1, #11, #12 and #13) and retrofitted six others (#2, #4, #5, #7, #8 and #9). In addition, the City <br />changed the way the lift stations are monitored by converting all 14 stations to the Omni System. <br /> <br />This proposal includes pumps and associated piping, control panel, electric winch and safety hatch. <br />These items are necessary to update the lift station for operational and maintenance purposes. The <br />addition of the crane and safety hatch will allow for staff to maintain the lift station with proper safety <br />protocols in place. The proposal is itemized as follows: <br /> <br />Item Cost <br />Replacement Pumps and Piping $32,326.00 <br />Control Panel $35,137.00 <br />Crane with Electric Winch $6,263,00 <br />Safety Hatch $1,985.00 <br />TOTAL $75,711.00 <br /> <br />Attachment <br /> <br />Attachment A: Electric Pump Proposal for equipment for Lift Station #11 <br />CONSENT – 6K <br /> MEMORANDUM <br />