My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
12-10-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 11:25:22 AM
Creation date
12/7/2018 11:22:31 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE AID FOR LOCAL TRANSPORTATION Rev. February 2018 <br /> CHANGE ORDER <br /> <br /> <br /> <br />SP/SAP(s) 187-020-021 MN Project No.: Change Order No. 4 <br /> <br />Page 1 of 2 <br /> <br />Project Location Old Snelling Trail, County Road E, and E2 <br />Local Agency Arden Hills Local Project No. <br />Contractor Sunram Contracting Contract No. <br />Address/City/State/Zip 20010 75th Ave north, Corcoran, MN 55340 <br />Total Change Order Amount $ 5,904.56 <br /> <br />During the construction of the project it was determined that the current sign locations on the <br />pedestrian flasher pedestal at the Bethel University intersection did not comply with current ADA <br />specifications. The signs and solar battery had to be raised on the pole and additional matching <br />signs were required on the backsides of the pole. The same work was performed on the adjacent <br />pedestrian flasher pedestal on the opposite side of the road. The contractor agreed to the <br />additional work but asked to be compensated for the work. <br /> <br />During construction, the county requested that drain tile be installed in the sand subbase and <br />connected to the newly constructed storm sewer system. The drain tile that had to be installed in <br />areas where the base materials were previously placed required additional time and effort to <br />install. The Contractor agreed to perform this additional work as T&M. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.