Laserfiche WebLink
EPOXY <br />Totals For Section SCHEDULE C - TRAIL IMPROVEMENTS - COUNTY <br />ROAD E2:($2,536.60) $220,507.94 <br />SCHEDULE D - STORM SEWER IMPROVEMENTS - SOUTH OLD SNELLNIG TRAIL <br />184 2104.501 <br />REMOVE SEWER <br />PIPE (STORM)L F $11.00 100 0 $0.00 180 $1,980.00 <br />185 2104.509 <br />REMOVE PIPE <br />APRON EACH $315.00 1 0 $0.00 1 $315.00 <br />186 2104.509 <br />REMOVE <br />DRAINAGE <br />STRUCTURE <br />EACH $525.00 5 0 $0.00 5 $2,625.00 <br />187 2105.607 1 1/2" CLEAR ROCK C Y $53.00 40 0 $0.00 231.23 $12,255.19 <br />188 2481.618 <br />MEMBRANE <br />WATERPROOFING S F $40.00 50 0 $0.00 7 $280.00 <br />189 2501.515 15" RC PIPE APRON EACH $800.00 6 0 $0.00 6 $4,800.00 <br />190 2501.515 24" RC PIPE APRON EACH $1,035.00 1 0 $0.00 1 $1,035.00 <br />191 2506.602 <br />ADJUST FRAME & <br />RING CASTING EACH $750.00 1 0 $0.00 1 $750.00 <br />192 2502.602 <br />12" PVC PIPE <br />DRAIN CLEANOUT EACH $1,260.00 1 0 $0.00 0 $0.00 <br />193 2503.541 <br />12" RC PIPE SEWER <br />DES 3006 CL V L F $48.00 53 0 $0.00 122 $5,856.00 <br />194 2503.541 <br />15" RC PIPE SEWER <br />DES 3006 CL V L F $50.25 553 0 $0.00 551.5 $27,712.88 <br />195 2503.541 <br />24" RC PIPE SEWER <br />DES 3006 CL III L F $61.00 12 0 $0.00 122 $7,442.00 <br />196 2506.602 CHIMNEY SEALS EACH $500.00 9 0 $0.00 14 $7,000.00 <br />197 2503.602 <br />CONNECT TO <br />EXISTING STORM <br />SEWER <br />EACH $1,050.00 2 0 $0.00 6 $6,300.00 <br />198 2503.603 10" TRENCH DRAIN L F $260.00 60 0 $0.00 0 $0.00 <br />199 2503.603 <br />10" HDPE PIPE <br />SEWER L F $95.00 10 0 $0.00 0 $0.00 <br />200 2506.501 <br />CONST DRAINAGE <br />STRUCTURE <br />DESIGN H <br />L F $1,035.00 1 0 $0.00 1.6 $1,656.00 <br />201 2506.501 <br />CONST DRAINAGE <br />STRUCTURE <br />DESIGN SD-48 <br />L F $590.00 3.6 0 $0.00 3.6 $2,124.00 <br />202 2506.501 <br />CONST DRAINAGE <br />STRUCTURE DES <br />48-4020 <br />L F $390.00 40.4 0 $0.00 42.75 $16,672.50 <br />203 2506.502 <br />CONST DRAINAGE <br />STRUCTURE <br />DESIGN SPEC 1 <br />EACH $2,335.00 3 0 $0.00 8 $18,680.00 <br />204 2506.516 <br />CASTING <br />ASSEMBLY EACH $600.00 9 0 $0.00 17 $10,200.00 <br />205 2511.501 <br />RANDOM RIPRAP <br />CLASS III C Y $130.00 10 0 $0.00 455.96 $59,274.80 <br />206 2511.501 RANDOM RIPRAP C Y $130.00 22.8 0 $0.00 10.44 $1,357.20 <br />03455-14 Project Material Status <br />Line Item Description Units Unit Price <br />Contract <br />Quantity <br />Quantity <br />This <br />Pay <br />Voucher <br />Amount This <br />Pay Voucher <br />Quantity <br />To Date <br />Amount <br />To Date <br />CITY OF ARDEN HILLS <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />Project No. 03455-14 <br />Pay Voucher No. 7 <br />Page 11