Laserfiche WebLink
T.O. PRECAST <br />123'-4" <br />BASEML <br />100'-0" <br />T.O.M. GYMNASIUM <br />133'-4" <br />T.O. PRECAST <br />134'-8"EXISTINGNEW <br />CONSTRUCTION <br />48'-6" <br />+/- 5'-10" +/- 25'-0"+/- 102'-8"11'-0" 8'-0" 11'-2" 10'-10" <br />ARCHITECTURAL PRECAST <br />BRICK, TO MATCH EXISTING <br />ARCHITECTURAL <br />PRECASTMECHANICAL UNITS, SCREENED <br />METAL COPING <br />HM DOOR <br />ALUMINUM WINDOW <br />ASSEMBLY <br />ALUMINUM STOREFRONT <br />BASEML <br />100'-0" <br />(1984) GYM-T.O.M. <br />129'-9 3/8" <br />BRICK, TO MATCH EXISTING <br />63'-6" <br />METAL COPING <br />ALUMINUM STOREFRONT <br />BASEML <br />100'-0" <br />BRICK, TO <br />MATCH EXISTING <br />T.O. PRECAST <br />123'-4" <br />BASEML <br />100'-0" <br />T.O.M. GYMNASIUM <br />133'-4" <br />MECHANICAL UNIT, SCREENEDMECHANICAL UNIT, SCREENED <br />+/- 41'-10"178'-0" <br />ARCHITECTURAL PRECASTBRICK, TO MATCH EXISTING <br />METAL COPING ALUMINUM STOREFRONTALUMINUM WINDOW ASSEMBLY <br />BASEML <br />100'-0" <br />B.O. PRECAST <br />112'-10" <br />T.O.M. <br />123'-4" <br />T.O.M. GYMNASIUM <br />133'-4" <br />T.O. PRECAST <br />134'-8" <br />10" <br />10'-0" 27'-11"+/- 61'-6"+/- 93'-10" <br />40'-2" <br />MECHANICAL UNIT, SCREENED MECHANICAL UNIT, SCREENEDILLUMINATED EXTERIOR SIGNAGE <br />ALUMINUM WINDOW <br />SYSTEM, TYP <br />METAL COPING <br />ARCHITECTURAL PRECAST <br />HM DOOR <br />BASEML <br />100'-0" <br />B.O. PRECAST <br />112'-10" <br />T.O.M. GYMNASIUM <br />133'-4" <br />T.O. PRECAST <br />134'-8" <br />10'-0" 27'-2" 6'-0" <br />40'-2" <br />ARCHITECTURAL PRECAST <br />BRICK, TO MATCH EXISTING <br />METAL COPING <br />BASEML <br />100'-0" <br />T.O.M. PRECAST <br />123' 4" <br />T.O.M. GYMNASIUM <br />133' 4" <br />77'-8"73'-8" <br />BRICK, TO MATCH EXISTING <br />ARCHITECTURAL <br />PRECAST <br />MECHANICAL UNITS, SCREENED <br />HM DOOR <br />METAL COPING <br />D2 <br />CCW.8 <br />B1 <br />CCW.8 <br />F1 <br />CCW.8 <br />E1 <br />CCW.8 <br />B6 <br />CCW.8 <br />D1 <br />CCW.8 <br />E7 <br />CCW.8 <br />F <br />E <br />D <br />C <br />B <br />A <br />1 2 3 4 5 6 7 8 <br />A <br />MN <br />NorthCheck: <br />Drawn: <br />Date: <br />Comm: <br />License <br />Number: <br />I hereby certify that this plan, specification or report was prepared by <br />me or under my direct supervision and that I am a duly Licensed <br />under the laws of the State of <br />Scale: <br />Date <br />501 South Eighth Street <br />Minneapolis, MN 55404 <br />krausanderson.com | 612 332 7281 <br />12/3/2018 3:17:03 PMC:\Users\lschneider\Documents\172270_MVHS 2019 IMPROVEMENTS_lschneider@woldae.com.rvtAs indicatedCentral: \\Wae-srv-mn.woldae.com\StPaul\ISD621\HS_MOUNDS VIEW\172270 - 2018 Addition andRenovation\02_ARCH\Revit\172270_MVHS 2019 IMPROVEMENTS.rvtCCW.8 <br />EXTERIOR <br />ELEVATIONS - <br />GYMNASIUM <br />NOT FOR CONSTRUCTION <br />DECEMBER 3, 2018 <br />172270 <br />MINNESOTA <br />02/06/2019 <br />PAUL APLIKOWSKI <br />42737 <br />ARCHITECT <br />ISD #621: MOUNDS VIEW <br />PUBLIC SCHOOLS <br />MOUNDS VIEW <br />HIGH SCHOOL 2019 <br />IMPROVEMENTS <br />4570 VICTORIA STREET N <br />SHOREVIEW, MINNESOTA 55126 <br />1900 LAKE VALENTINE ROAD <br />ARDEN HILLS, MINNESOTA 55112 <br />Revisions <br />Description Date Num <br />0 <br />1/8" = 1'-0" <br />GYMNASIUM - EAST ELEVATIONB1 <br />6' 12' <br />0 <br />1/8" = 1'-0" <br />WEIGHTS AND CARDIO - SOUTH ELEVATIONB6 <br />6' 12' <br />0 <br />1/8" = 1'-0" <br />CIRCULATION - SOUTH ELEVATIOND1 <br />6' 12' <br />0 <br />1/8" = 1'-0" <br />GYMNASIUM - SOUTH ELEVATIOND2 <br />6' 12' <br />0 <br />1/8" = 1'-0" <br />GYMNASIUM - NORTH ELEVATIONE1 <br />6' 12' <br />0 <br />1/8" = 1'-0" <br />GYMNASIUM - NORTH ELEVATION - THROUGH CANOPYE7 <br />6' 12' <br />0 <br />1/8" = 1'-0" <br />GYMNASIUM - WEST ELEVATIONF1 <br />6' 12'