Laserfiche WebLink
Page 7 of 11 <br />Water Connection Fee – <br />Connection fee for previously <br />un-served or expanded lots <br />$840.00 per acre or portion <br />thereof <br />Water Availability Fee – New <br />or Additional Units <br />The units are based on the <br />Metropolitan Council’s formula <br />for calculating new sewer <br />availability charge (SAC) units <br />$ 1,375 per unit <br />Sewer Connection Fee – <br />Connection fee for previously <br />un-served or expanded lots <br />$840.00 per acre or portion <br />thereof <br />Sewer Availability Fee – New <br />or Additional Units <br />The units are base d on the <br />Metropolitan Council’s formula <br />for calculating new sewer <br />availability charge (SAC) units <br />$ 825.00 pe r unit <br />Sewer Permits – Service <br />Installation/Alternations/Repairs <br />Per inspection $40.00 <br />Sewer Permits – Plan Review <br />Fee <br />Set by Inspector <br />Sewer Permits – Reinspections $40.00 per hour <br />Sewer Access Charge Set by Met Council Annually $2,485.00 <br />Sanitary Sewer Utility Prohibited <br />Sump Pump Connection <br />Surcharge <br />$100.00 per month <br />IX.Miscellaneous/Retail Activities <br />Boutique/Garage Sale Application /notification of City Hall required No charge <br />Tent Permit $55.00+ State Surcharge <br />Sidewalk Sales $53.00 <br />Business Licensing – <br />Amusement Facilities <br />Includes arcade, dance hall, <br />movie theater, pool/billiard <br />tables, bowling alleys, indoor <br />tennis, skating facility, outdoor tennis, driving ranges, etc. <br />$105.00 <br />Business Licensing – Wholesale <br />Bulk Fuel Storage <br />Liability insurance required $210.00 <br />Business Licensing – <br />Hotel/Motel <br />$6.50 per room <br />Business Licensing – Courtesy <br />Bench, Non-advertising <br />$26.00 <br />Business Licensing – Courtesy <br />Bench, Advertising <br />$79.00 <br />Business Licensing – Mechanical/Electronic Devices Includes musical devices, amusement rides, bowling alleys, <br />etc. <br />$15.00 per location + $15.00 per machine <br />(MN Statute 449.15 sets <br />maximum permit fee at $15 per <br />location and $15 per machine)