My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-14-19-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
01-14-19-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 4:26:59 PM
Creation date
1/10/2019 4:08:38 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
974
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills – 2040 Comprehensive Plan <br /> <br /> <br />Approved: January 14, 2019 <br />B-9 <br />Table B.3 – MnDOT Access Management Manual – Summary of Recommended Street Spacing for <br />Interregional Corridors <br />Category Area or <br />Facility Type <br />Typical <br />Functional Class <br />Public Street Spacing <br />Signal Spacing Primary <br />Full-Movement <br />Intersection <br />Secondary <br />Intersection <br />1 High Priority Interregional Corridors & Interstate System (IRCs) <br />1F Interstate Freeway <br />Principal Arterials <br />Interchange Access Only <br />1AF Non-Interstate <br />Freeway <br />Interchange Access Only <br />(see Section 3.2.7 for interim spacing) <br />See Section 3.2.5 for <br />Signalization on <br />Interregional Corridors <br />1A Rural 1 mile 1/2 mile <br />1B Urban/Urbanizing 1/2 mile 1/4 mile <br />1C Urban Core 300-660 feet dependent upon block length <br />2 Medium Priority Interregional Corridors <br />2AF Non-Interstate <br />Freeway <br />Principal Arterials <br />Interchange Access Only <br />(See Section 3.2.7 for interim spacing) See Section 3.2.5 for <br />Signalization on <br />Interregional Corridors <br />2A Rural 1 mile 1/2 mile <br />2B Urban/Urbanizing 1/2 mile 1/4 mile <br />2C Urban Core 300-660 feet, dependent upon block length ¼ mile <br />3 Regional Corridors <br />3AF Non-Interstate <br />Freeway <br />Principal and <br />Minor Arterials <br />Interchange Access Only <br />(see Section 3.2.7 for interim spacing) Interim <br />3A Rural 1 mile 1/2 mile See Section 3.2.5 <br />3B Urban/Urbanizing 1/2 mile 1/4 mile 1/2 mile <br />3C Urban Core 300-660 feet, dependent upon block length 1/4 mile <br />Source: MnDOT
The URL can be used to link to this page
Your browser does not support the video tag.