Laserfiche WebLink
<br />Conceptual Construction Costs <br />© 2018 HGA 16 <br />53,000 GSF <br />$260/sf <br />$12,780,000 $340/sf <br />$18,020,000 <br />Factors that influence cost: <br />1.Space types <br />a)Gym and walking track <br />b)Specialized spaces such as pottery studio <br />c)Meeting/conference rooms <br />d)Auditorium <br />e)Roof terrace <br />2.Sustainability goals –code compliant building vs net-zero energy goals <br />3.Bidding climate <br />4.Escalation <br />Estimates above do not include Owner soft costs which may be approximately 30% of the budget.