326B.153 BUILDING PERMIT FEES.
<br />Subdivision 1.Building permits.(a) Fees for building permits submitted as required in section 326B.107
<br />include:
<br />(1) the fee as set forth in the fee schedule in paragraph (b) or as adopted by a municipality; and
<br />(2) the surcharge required by section 326B.148.
<br />(b) The total valuation and fee schedule is:
<br />(1) $1 to $500, $21;
<br />(2) $501 to $2,000, $21 for the first $500 plus $2.75 for each additional $100 or fraction thereof, to and
<br />including $2,000;
<br />(3) $2,001 to $25,000, $62.25 for the first $2,000 plus $12.50 for each additional $1,000 or fraction
<br />thereof, to and including $25,000;
<br />(4) $25,001 to $50,000, $349.75 for the first $25,000 plus $9 for each additional $1,000 or fraction
<br />thereof, to and including $50,000;
<br />(5) $50,001 to $100,000, $574.75 for the first $50,000 plus $6.25 for each additional $1,000 or fraction
<br />thereof, to and including $100,000;
<br />(6) $100,001 to $500,000, $887.25 for the first $100,000 plus $5 for each additional $1,000 or fraction
<br />thereof, to and including $500,000;
<br />(7) $500,001 to $1,000,000, $2,887.25 for the first $500,000 plus $4.25 for each additional $1,000 or
<br />fraction thereof, to and including $1,000,000; and
<br />(8) $1,000,001 and up, $5,012.25 for the first $1,000,000 plus $2.75 for each additional $1,000 or fraction
<br />thereof.
<br />(c) Other inspections and fees are:
<br />(1) inspections outside of normal business hours (minimum charge two hours), $63.25 per hour;
<br />(2) reinspection fees, $63.25 per hour;
<br />(3) inspections for which no fee is specifically indicated (minimum charge one-half hour), $63.25 per
<br />hour; and
<br />(4) additional plan review required by changes, additions, or revisions to approved plans (minimum
<br />charge one-half hour), $63.25 per hour.
<br />(d) If the actual hourly cost to the jurisdiction under paragraph (c) is greater than $63.25, then the greater
<br />rate shall be paid. Hourly cost includes supervision, overhead, equipment, hourly wages, and fringe benefits
<br />of the employees involved.
<br />[See Note.]
<br />Subd. 2.Plan review.Fees for the review of building plans, specifications, and related documents
<br />submitted as required by section 326B.106 must be paid based on 65 percent of the building permit fee
<br />required in subdivision 1.
<br />Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.