My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-19-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
04-22-19-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2019 4:14:40 PM
Creation date
4/18/2019 4:08:19 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site ID Controller RTU Enclosure Year 4GLTE upgrade Yearly Cost Monthly Comments <br />LS-1 IntraLink LC150 Crystal Ball Stainless Steel 2012 $300 $270 $22.48 <br />LS-2 IntraLink LC150 Crystal Ball Stainless Steel 2011 $300 $270 $22.48 <br />LS-3 Digital Control Company Crystal Ball Stainless Steel Not Sure $300 $270 $22.48 <br />LS-4 IntraLink LC150 Crystal Ball Stainless Steel 2013 $300 $270 $22.48 <br />LS-5 IntraLink LC150 Crystal Ball Stainless Steel 2011 $300 $270 $22.48 <br />LS-6 Diversified Duplex Controller Crystal Ball Painted Steel Older $300 $270 $22.48 <br />LS-7 IntraLink LC150 Crystal Ball Stainless Steel 2013 $300 $270 $22.48 <br />LS-8 IntraLink LC150 Crystal Ball Stainless Steel 2011 $300 $270 $22.48 <br />LS-9 IntraLink LC150 Crystal Ball Stainless Steel 2013 $300 $270 $22.48 <br />LS-10 Floats and relays Crystal Ball Stainless Steel 1989 $300 $270 $22.48 <br />LS-11 IntraLink LC150 Crystal Ball Stainless Steel 2017 $300 $270 $22.48 <br />LS-12 IntraLink LC150 Crystal Ball Stainless Steel 2017 $300 $270 $22.48 <br />LS-13 IntraLink LC150 Crystal Ball Stainless Steel 2012 $300 $270 $22.48 <br />LS-14 Digital Control Company Crystal Ball Painted Steel 1995 $300 $270 $22.48 <br />South Tower N/A XR50 FRP ?$300 $270 $22.48 <br />Booster + Tower <br />Booster SLC 5/03 High Tide Painted Steel ??Needs Replacement $262.50 $21.88 Assuming two year contract <br />Tower Not Required XR50 FRP ?? <br />Tower Only Not Required High Tide FRP ??Needs Replacement $262.50 $21.88 Assuming two year contract <br />$4,571 $381 <br />CURRENT CELLULAR OPERATING COSTS
The URL can be used to link to this page
Your browser does not support the video tag.