Laserfiche WebLink
UpFront Costs -- Upgrades Only Capital Labor Engineering Design Fees*Operating Costs/yr 2019 $10 yrs <br />UpGrade Existing Crystal Ball RTUs @ $300 each x 16 4,800.00$ Owner $0 4,800.00$ <br />Replace One High Tide Units with Crystal Ball @ 1 X $4k 4,000.00$ 4,000.00$ 5,000.00$ 13,000.00$ 13,000.00$ <br />Fix Pressure Transmitter Problem with Radio Telemetry 17,000.00$ Included 5,000.00$ 22,000.00$ 22,000.00$ <br />Fix Pressure Transmitter Problem with Radio Cellular 5,000.00$ 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ <br />Proposed 2019 Upgrade Costs w/ Radio Telemetry (2-sites)35,000.00$ <br />Proposed 2019 Upgrade Costs w/ Celluar Telemetry (2-sites)28,000.00$ <br />Proposed 2019 Upgrade Costs for PLC & I/O, Only 8,000.00$ 12,000.00$ 2,000.00$ 22,000.00$ <br />Simple Math Cost to Operate remaining Cellular = $289 x 16 -$ -$ -$ 4,624.00$ 46,240.00$ <br />Simple Math for Private Radio System $118,845.00 $72,200.00 $35,000 -$ $226,045.00 <br />SIMPLE TEN (10) YEAR COST COMPARISON <br />* Engineering fees subject to change depending on how the project is executed according to Owner's Decisions