My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-19-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
04-22-19-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2019 4:14:40 PM
Creation date
4/18/2019 4:08:19 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UpFront Costs -- Upgrades Only Capital Labor Engineering Design Fees*Operating Costs/yr 2019 $10 yrs <br />UpGrade Existing Crystal Ball RTUs @ $300 each x 16 4,800.00$ Owner $0 4,800.00$ <br />Replace One High Tide Units with Crystal Ball @ 1 X $4k 4,000.00$ 4,000.00$ 5,000.00$ 13,000.00$ 13,000.00$ <br />Fix Pressure Transmitter Problem with Radio Telemetry 17,000.00$ Included 5,000.00$ 22,000.00$ 22,000.00$ <br />Fix Pressure Transmitter Problem with Radio Cellular 5,000.00$ 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ <br />Proposed 2019 Upgrade Costs w/ Radio Telemetry (2-sites)35,000.00$ <br />Proposed 2019 Upgrade Costs w/ Celluar Telemetry (2-sites)28,000.00$ <br />Proposed 2019 Upgrade Costs for PLC & I/O, Only 8,000.00$ 12,000.00$ 2,000.00$ 22,000.00$ <br />Simple Math Cost to Operate remaining Cellular = $289 x 16 -$ -$ -$ 4,624.00$ 46,240.00$ <br />Simple Math for Private Radio System $118,845.00 $72,200.00 $35,000 -$ $226,045.00 <br />SIMPLE TEN (10) YEAR COST COMPARISON <br />* Engineering fees subject to change depending on how the project is executed according to Owner's Decisions
The URL can be used to link to this page
Your browser does not support the video tag.