Laserfiche WebLink
Project Fee Estimate <br />Arden Hills 4/11/2019 <br />TH 10 Watermain Construction Administration LPP <br />SR PM Reg Engineer Grad. <br />Engineer <br />1 Construction Observation <br />1.1 Construction Administration 32 32 64 8,736$ <br />1.2 Project Meetings 4 4 8 1,092$ <br />1.3 MMB Project Documentation 10 10 20 2,730$ <br />1.4 MNDOT Project Documentation 2 16 8 26 2,558$ <br />1.5 Final Documentation and As-Builts 2 8 12 22 2,154$ <br />- -$ <br />SUBTOTAL HOURS 50 70 20 140 <br />SUBTOTAL COST 17,270$ <br />Expenses: <br />Travel & Subsistence (TS)50$ <br />Subtotal 17,320$ <br />TOTAL HOURS 50 70 20 140 <br />TOTAL LABOR COST 17,270$ <br />TOTAL EXPENSES 50$ <br />TOTAL PROJECT 17,320$ <br />TOTAL (ROUNDED)17,400$ <br />Total Dollars <br />Estimated Person Hours Required Total <br />Hours <br />Project: <br />Client: <br />Task Task Description