Laserfiche WebLink
<br />_____________________________________________________________________________________________ <br />City of Arden Hills <br />Planning Commission Meeting for April 3, 2019 <br />P:\Planning\Planning Cases\2018\PC 18-014 - Mounds View School District - 1900 & 1901 Lake Valentine <br />Road\Memos Reports <br />Page 12 of 13 <br />12. The Applicant shall be responsible for obtaining any other permits necessary from other <br />agencies, MPCA, Rice Creek Watershed District, etc. prior to the start of any site <br />activities. <br />13. All disturbed boulevards shall be restored with sod. <br />14. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />15. The Applicant shall be responsible for obtaining a land disturbance Grading and Erosion <br />Control permit from the City’s Engineering Division prior to the commencement of any <br />land disturbance activities. <br />16. Heavy duty silt fence and adequate erosion control around the entire construction site <br />shall be required and maintained by the Developer during construction to ensure that <br />sediment and storm water does not leave the project site. <br />17. Prior to the 2019-2020 school year school year starting the applicant shall stripe a <br />minimum of 334 parking stalls in parking lot located on PID 213023340005. Parking <br />stalls dimensions shall be 9 feet by 18 feet. <br />18. Prior to the issuance of a grading permit, the school district shall provide the City in <br />writing how they will staff the pedestrian crossing during student arrive and release. <br />19. Prior to the issuance of a Grading and Erosion Control permit the Engineering <br />Department shall approve the Final grading, utility, stormwater and right of way <br />improvement plans. <br />20. The Applicant and city staff shall review traffic and pedestrian operations prior to the end <br />2019-2020 school year. The Applicant shall implement improvements recommended by <br />the City Engineer. <br />21. Prior to the issuance of a land disturbance permit, all items identified in the March 5, <br />2019 Engineering Review Comments memo shall be addressed. All comments shall be <br />adopted herein by reference. <br />22. Prior to the issuance of a building permit, snow removal plan shall be submitted. <br />23. The proposed mascot wall sign may be externally illumined and shall be approved by <br />planning staff in writing. Internal illumination is prohibited. The proposed mascot sign <br />shall not exceed 53 square feet. Final location of the proposed mascot wall sign shall be <br />approved in writing by planning staff. <br /> <br />Proposed Motion Language <br /> <br />1. Recommend Approval with Conditions: Motion to recommend approval of Planning Case 18- <br />014 for a Master and Final PUD at 1900 Lake Valentine Road, based on the findings of fact <br />and submitted plans, as amended by the conditions in the April 3, 2019, Report to the Planning <br />Commission. <br />