Laserfiche WebLink
City of Arden Hills <br />May 3, 2019 <br />Page 4 <br /> <br />6. Fee <br /> <br />Our lump sum fee is provided below. <br /> <br />Services Estimated Cost <br />Field Work <br />Mob/demob of drilling rig, staking borings, drilling 27 <br />standard penetration borings (270 linear feet), backfilling <br />boreholes per MDH guidelines, Gopher State One Call <br />Utility Clearances. <br />$8,024 <br />Laboratory/Office Work <br />Project Management/Assistance, Soil classification, <br />boring logs, laboratory testing, boring location sketch, <br />Geotechnical Reports (3). <br />$5,473 <br />Lump Sum Cost $13,497 <br /> <br />If additional borings or deeper borings are needed, or if engineering and testing are <br />requested beyond that necessary for preparation of our report (post-report consultation, <br />report revision due to changes in building design or location, specification review, or pre - <br />construction meetings), the increase in our fees will be in accordance with the rates <br />previously indicated or at the unit prices shown on the enclosed Rate Schedule for hourly <br />services. <br /> <br />If have any questions regarding our scope of services or how they may be modified to <br />meet your project needs please feel free to give us a call to discuss. <br />