My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-22-19-CRR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
05-22-19-CRR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 4:02:23 PM
Creation date
5/22/2019 2:25:29 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
85 2105.501 <br />EXCAVATION (EV) <br />(P)C Y $13.25 2500 0 $0.00 2500 $33,125.00 <br />86 2105.507 <br />SUBGRADE <br />EXCAVATION (EV)C Y $15.35 500 0 $0.00 2509 $38,513.15 <br />87 2105.522 <br />SELECT <br />GRANULAR <br />BORROW (CV) <br />C Y $28.75 1840 0 $0.00 2889 $83,058.75 <br />88 2105.601 DEWATERING LS $27,000.00 1 0 $0.00 1 $27,000.00 <br />89 2105.604 <br />GEOTEXTILE <br />FABRIC TYPE V S Y $3.00 150 0 $0.00 0 $0.00 <br />90 2105.604 GEOGRID S Y $5.00 70 0 $0.00 0 $0.00 <br />91 2123.610 <br />STREET <br />SWEEPER (WITH <br />PICKUP BROOM) <br />HOUR $150.00 15 4 $600.00 14.5 $2,175.00 <br />92 2211.501 <br />AGGREGATE <br />BASE CLASS 5 TON $22.80 1220 0 $0.00 1536.5 $35,032.20 <br />93 2232.501 <br />MILL BITUMINOUS <br />SURFACE (2.0")S Y $9.00 600 0 $0.00 856 $7,704.00 <br />94 2357.502 <br />BITUMINOUS <br />MATERIAL FOR <br />TACK COAT <br />GAL $1.05 130 0 $0.00 0 $0.00 <br />95 2360.503 <br />TYPE SP 9.5 <br />WEARING <br />COURSE MIX <br />(2,B), 3.0" THICK <br />S Y $16.00 1870 0 $0.00 1493 $23,888.00 <br />96 2360.505 <br />TYPE SP 12.5 BIT <br />MIXTURE FOR <br />PATCHING <br />TON $115.00 570 0 $0.00 477.37 $54,897.55 <br />97 2411.618 <br />PREFABRICATED <br />MODULAR BLOCK <br />WALL <br />S F $63.00 4446 0 $0.00 5058 $318,654.00 <br />98 2411.618 <br />ANTI-GRAFFITI <br />COATING S F $3.25 4446 0 $0.00 4440 $14,430.00 <br />99 2451.501 <br />STRUCTURE <br />EXCAVATION <br />CLASS U <br />C Y $19.45 530 0 $0.00 0 $0.00 <br />100 2451.503 <br />GRANULAR <br />BACKFILL (LV)C Y $28.75 660 0 $0.00 0 $0.00 <br />101 2452.618 <br />STEEL SHEET <br />PILING <br />(TEMPORARY) <br />S F $41.00 3410 0 $0.00 1540 $63,140.00 <br />102 2502.601 <br />IRRIGATION <br />SYSTEM <br />PROVISION <br />LS $5,000.00 1 0 $0.00 0 $0.00 <br />103 2505.601 <br />UTILITY <br />COORDINATION LS $10,000.00 1 0 $0.00 1 $10,000.00 <br />104 2521.501 <br />6" CONCRETE <br />WALK S F $13.25 840 0 $0.00 1053 $13,952.25 <br />105 2531.501 <br />CONCRETE CURB <br />& GUTTER <br />DESIGN B624 <br />L F $30.00 995 0 $0.00 1478 $44,340.00 <br />03455-14 Project Material Status <br />Line Item Description Units Unit Price <br />Contract <br />Quantity <br />Quantity <br />This <br />Pay <br />Voucher <br />Amount <br />This <br />Pay <br />Voucher <br />Quantity <br />To Date <br />Amount <br />To Date <br />CITY OF ARDEN HILLS <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />Project No. 03455-14 <br />Pay Voucher No. 8 <br />Page 7
The URL can be used to link to this page
Your browser does not support the video tag.