My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-22-19-CRR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
05-22-19-CRR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 4:02:23 PM
Creation date
5/22/2019 2:25:29 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
128 2582.502 PAINT L F $0.65 1275 0 $0.00 5770 $3,750.50 <br />129 2582.502 <br />4" SOLID LINE <br />EPOXY L F $0.70 1000 0 $0.00 0 $0.00 <br />130 2564.603 <br />4" SOLID LINE <br />YELLOW - EPOXY L F $0.70 25 0 $0.00 0 $0.00 <br />Totals For Section SCHEDULE B - TRAIL IMPROVEMENTS - NORTH <br />OLD SNELLING TRAIL:$2,803.00 $963,848.45 <br />SCHEDULE C - TRAIL IMPROVEMENTS - COUNTY ROAD E2 <br />131 2021.501 MOBILIZATION LS $300,000.00 0.1 0 $0.00 0.1 $30,000.00 <br />132 2101.501 CLEARING ACRE $11,000.00 0.02 0 $0.00 0 $0.00 <br />133 2101.502 CLEARING TREE $315.00 2 0 $0.00 0 $0.00 <br />134 2101.506 GRUBBING ACRE $11,000.00 0.02 0 $0.00 0 $0.00 <br />135 2101.507 GRUBBING TREE $315.00 2 0 $0.00 0 $0.00 <br />136 2104.501 <br />REMOVE <br />CONCRETE CURB L F $7.40 20 0 $0.00 11 $81.40 <br />137 2104.501 <br />REMOVE SEWER <br />PIPE (STORM)L F $37.00 25 0 $0.00 33 $1,221.00 <br />138 2104.503 <br />REMOVE <br />CONCRETE WALK S F $3.10 110 0 $0.00 196.5 $609.15 <br />139 2104.503 <br />REMOVE <br />BITUMINOUS <br />WALK <br />S F $1.60 705 0 $0.00 1123 $1,796.80 <br />140 2104.505 <br />REMOVE <br />BITUMINOUS <br />DRIVEWAY <br />PAVEMENT <br />S Y $3.80 50 0 $0.00 57 $216.60 <br />141 2104.505 <br />REMOVE <br />BITUMINOUS <br />PAVEMENT <br />S Y $4.15 1520 0 $0.00 1530 $6,349.50 <br />142 2104.513 <br />SAWING BIT <br />PAVEMENT (FULL <br />DEPTH) <br />L F $1.85 590 0 $0.00 1031 $1,907.35 <br />143 2104.509 <br />REMOVE <br />DRAINAGE <br />STRUCTURE <br />EACH $630.00 1 0 $0.00 0 $0.00 <br />144 2104.523 <br />SALVAGE <br />CASTING EACH $55.00 2 0 $0.00 1 $55.00 <br />145 2104.523 SALVAGE SIGN EACH $21.00 2 2 $42.00 4 $84.00 <br />146 2105.501 <br />COMMON <br />EXCAVATION (EV) <br />(P) <br />C Y $13.25 4 0 $0.00 4 $53.00 <br />147 2105.507 <br />SUBGRADE <br />EXCAVATION (EV)C Y $15.35 210 0 $0.00 210 $3,223.50 <br />148 2105.522 <br />SELECT <br />GRANULAR <br />BORROW (CV) <br />C Y $28.75 340 0 $0.00 799.33 $22,980.74 <br />149 2105.601 DEWATERING LS $3,000.00 1 0 $0.00 1 $3,000.00 <br />150 2123.610 <br />STREET <br />SWEEPER (WITH <br />PICKUP BROOM) <br />HOUR $150.00 5 0 $0.00 5 $750.00 <br />03455-14 Project Material Status <br />Line Item Description Units Unit Price <br />Contract <br />Quantity <br />Quantity <br />This <br />Pay <br />Voucher <br />Amount <br />This <br />Pay <br />Voucher <br />Quantity <br />To Date <br />Amount <br />To Date <br />CITY OF ARDEN HILLS <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />Project No. 03455-14 <br />Pay Voucher No. 8 <br />Page 9
The URL can be used to link to this page
Your browser does not support the video tag.