ARDEN HILLS PLANNING COMMISSION – April 3, 2019 3 <br /> <br />the landscaping, structure coverage, and other similar requirements. For example, one property in <br />the PUD may have 60 percent building coverage, but the development as a whole may not exceed <br />50 percent building coverage to maintain conformance with the underlying zoning district. <br /> <br />Planning Consultant Kanzier explained the PUD development process is comprised of <br />multiple steps. The first step is the Master PUD, which is a detailed concept plan for the entire <br />development outlining the individual phases over a period of time. The City also works with the <br />developer during this stage to set a design framework for the development. These standards are <br />written into a development agreement, which generally includes the design standards, a list of <br />conditions, and what deviations from the underlying zoning district will be permitted. A Final <br />PUD proposal is then submitted prior to the development of each successive phase of the project. <br />This plan provides a greater level of detail than the Master PUD and must conform to the <br />approved development agreement. <br /> <br />Planning Consultant Kanzier stated at this time, the applicant is simultaneously applying for <br />both the Master and Final PUD. They hope to complete all the proposed development in a single <br />phase. However, due to budget constraints, it may be necessary to delay the resurfacing and <br />striping of the north parking lot to a later date. This phase primarily involves grading and <br />reconstruction of the surface lot. If the applicant must delay this work, staff believes this phase <br />can be reviewed as a site plan. <br /> <br />Site Data <br />Future Land Use Plan: PI: Public and Institutional <br />Existing Land Use: Institutional: High School, and former site of First Transit bus <br />garage <br />Zoning: R-1: Single Family Residential <br />Current Lot Sizes: 65.37 Acres <br />Topography: There grades on the south side of Lake Valentine Road <br />(existing school site) vary about 20’ from the road (low point) <br />to the south side of the lot (high point). This site has been <br />graded over the years to accommodate the buildings, athletic <br />fields and parking lots. <br /> <br />The lot on the north side of Lake Valentine Road slopes <br />towards the north, and has a 6’ variation from the high point of <br />the lot to the low point. <br /> <br />Planning Consultant Kanzier reviewed the surrounding area, the Plan Evaluation, the <br />Comprehensive Plan Amendment. She reported staff received revised plans that were submitted <br />by the applicant just this week. She explained the original plans were revised in a significant <br />manner with respect to the stormwater ponding and staff does not have enough information with <br />respect to stormwater calculations and a tree inventory. Because of the significant departure <br />from the original plans, staff recommended the Planning Commission table action on this item to <br />May 8, 2019. <br /> <br />City Planner Mrosla commented that the original plans showed the neighborhood the trees on <br />the site would be preserved and the new plans show the trees being removed for a stormwater