My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-08-19 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2019
>
05-08-19 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 12:18:02 PM
Creation date
6/3/2019 12:03:27 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_____________________________________________________________________________________________ <br />City of Arden Hills <br />Planning Commission Meeting for May 8, 2019 <br />P:\Planning\Planning Cases\2018\PC 18-014 - Mounds View School District - 1900 & 1901 Lake Valentine <br />Road\Memos Reports <br />Page 8 of 14 <br />Existing Parking Requirements <br />Land Use <br />Number of <br />Students/Staff Required Stalls <br />Number of Stalls <br />Provided <br />Parking <br />Deficiency/Surplus <br />Secondary Schools - 1 for <br />each school employee plus <br />one space per 4 students <br />1800/172* 622 517 -105 <br />Proposed Parking Requirements <br />Land Use <br />Number of <br />Students/Staff Required Stalls <br />Number of Stalls <br />Provided <br />Parking <br />Deficiency/Surplus <br />Secondary Schools - 1 for <br />each school employee plus <br />one space per 4 students <br />1800/172* 622 710 +88 <br />*Estimate 1800 students +/- 25 to 50 students depending on the time of year. <br />The official use of the north lot for school parking requires safety improvements on Lake <br />Valentine Road. Lake Valentine Road is currently a two -lane road with a center turn lane <br />between Janet Court and the west driveway into the school. This street is designated as a <br />Municipal State Aid System (MSAS) route. The City is eligible to receive funding for <br />maintenance and construction based on the number of miles of streets classified as MSAS <br />roads. In order to maintain this classification, the City must meet specific design standards, <br />including lane width and speed, for these roads. <br /> <br />The City has worked extensively with the Applicant to develop a plan to safely accommodate <br />pedestrians and vehicles at this location. The current plan includes crosswalks at two locations <br />across Lake Valentine Road, including two (2) push button attenuated flashing crosswalk <br />signals. The crosswalk signals are similar to the signals located at Valentine Hills Elementary <br />School. A new median, with pedestrian safety refuges, is also included in the plan. In order to <br />minimize points of conflict between pedestrians and vehicles, the plan also restricts the west <br />driveway into the north lot to right-in/right-out turns. The median will include mountable curb <br />to allow emergency vehicle access. A new sidewalk is proposed from the western access of <br />1901 Lake Valentine Road to Janet Court. The intent of the sidewalk to reduce mid-block <br />pedestrian crossings at Janet Court. A four (4’) foot tall decorative fence will be added to both <br />sides of the street in front of the school to guide students, staff and visitors to the crosswalks. <br />Additional signage and other modifications may occur as the Applicant and staff are working <br />to finalize the pedestrian crossing design. Finally, the staff is working with the Applicant to <br />obtain information needed to create a school speed zone at this location. MnDOT must approve <br />this designation but has indicated their support. <br />
The URL can be used to link to this page
Your browser does not support the video tag.