Laserfiche WebLink
<br />City of Arden Hills <br />Planning Commission Meeting for May 8, 2019 <br />P:\Planning\Planning Cases\2019\19-005 Boston Scientific - SP\Memos Reports <br /> Page 8 of 8 <br />4. Prior to the issuance of a building permit, a landscape financial security of $5,000.00 <br />dollars shall be submitted. Landscape financial security is held for two full growing <br />seasons. <br />5. Before construction, grading, or land clearing begins, trees or tree areas that are to be <br />preserved shall be visibly marked and city-approved tree protection fencing or other <br />method shall be installed and maintained at the critical root zones of the trees to be <br />protected. The location of the fencing shall be in conformance with the approved tree <br />preservation plan and approved by staff in writing. <br />6. The Applicant shall be responsible for obtaining a Grading and Erosion Control permit <br />from the City’s Engineering Division prior to the commencement of any land disturbance <br />activities. <br />7. Heavy duty silt fence and adequate erosion control around the entire construction site <br />shall be required and maintained by the Developer during construction to ensure that <br />sediment and stormwater do not leave the project site. <br />8. The Applicant shall be responsible for obtaining any other permits necessary from other <br />agencies, MPCA, Ramsey County, Rice Creek Watershed District, etc. prior to the start <br />of any site activities. <br />9. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments, and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Developer. <br /> <br />2) Recommend Approval without Conditions: Motion to recommend approval of Planning Case <br />19-005 for a Site Plan Review at 4100 Hamline Avenue North, based on the findings of fact <br />and the submitted plans in the May 8, 2019, Report to the Planning Commission. <br /> <br />3) Recommend Denial: Motion to recommend denial of 19-005 for a Site Plan Review at 4100 <br />Hamline Avenue North, based on the following findings of fact: findings to deny should <br />specifically reference the reasons for denial and why those reasons cannot be mitigated. <br /> <br />4) Table: Motion to table Planning Case 19-005 for a Site Plan Review at 4100 Hamline Avenue <br />North for the following reasons: a specific reason and/or information request should be <br />included with a motion to table. <br /> <br />Attachments <br /> <br />A. Land Use Application <br />B. Location Map <br />C. 11x17 Plan Sets