Laserfiche WebLink
ARDEN HILLS CITY COUNCIL—MAY 13, 2019 8 <br /> 5. Prior to the issuance of a Grading and Erosion Control permit, the Applicant shall <br /> determine if they will be adding 562 caliper inches of additional trees on the site, off-site <br /> or provide cash in lieu of replacement. <br /> 6. A Site Plan Review application shall be required for the reconstruction of the parking lot <br /> on PID 21302334005. <br /> 7. Any use of the existing building on the on PID 21302334005 other than cold storage will <br /> require an amendment to the approved PUD. The existing structure shall comply with <br /> City Code Chapter 14 and any other use of the building shall meet all applicable codes. <br /> 8. Overnight vehicle storage is prohibited. All overnight vehicle storage shall be stored in <br /> indoors. <br /> 9. No exterior storage shall be permitted onsite. <br /> 10. All light poles shall be a maximum of 25 feet in height, including base, and shall be <br /> shoebox style, downward directed, with high-pressure sodium or LED lamps and flush <br /> lens. Other than wash or architectural lighting, attached security lighting shall be shoebox <br /> style, downward directed with flush lens. In addition, any entry lighting under canopies <br /> shall be recessed and use a flush lens. Shields shall also be added as directed by the City. <br /> 11. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br /> same materials used on the building in accordance with City Code requirements. <br /> 12. Prior to the issuance of a Grading and Erosion Control permit, trees or tree areas that are to <br /> be preserved shall be visibly marked and City-approved tree protection fencing or other <br /> methods shall be installed and maintained at the critical root zones of the trees to be <br /> protected. The location of the fencing shall be in conformance with the approved tree <br /> preservation plan and approved by staff in writing. <br /> 13. The Applicant shall be responsible for obtaining any other permits necessary from other <br /> agencies, MPCA, Rice Creek Watershed District, etc. prior to the start of any site <br /> activities. <br /> 14. All disturbed boulevards shall be restored with sod. <br /> 15. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br /> infrastructure and components and any existing storm sewer from exposure to any and all <br /> stormwater runoff, sediments and debris during all construction activities. Temporary <br /> stormwater facilities shall be installed to protect the quality aspect of the proposed and <br /> existing stormwater facilities prior to and during construction activities. Maintenance of <br /> any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br /> 16. The Applicant shall be responsible for obtaining a land disturbance Grading and Erosion <br /> Control permit from the City's Engineering Division prior to the commencement of any <br /> land disturbance activities. <br /> 17. Heavy duty silt fence and adequate erosion control around the entire construction site shall <br /> be required and maintained by the Developer during construction to ensure that sediment <br /> and storm water does not leave the project site. <br /> 18. Prior to the beginning of the 2019-2020 school year, the Applicant shall stripe a minimum <br /> of 334 parking stalls in parking lot located on PID 213023340005. Parking stalls <br /> dimensions shall be 9 feet by 18 feet. <br /> 19. Prior to the issuance of a Grading and Erosion Control permit, the School District shall <br /> provide the City in writing how they will staff the pedestrian crossing during student <br /> arrival and release. City staff and the Ramsey County Sheriff shall review and approve the <br /> pedestrian crossing plan prior to August 1, 2019. The School District shall implement any <br /> I <br />