My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-10-19-SPC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2019
>
07-10-19-SPC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 10:47:02 AM
Creation date
7/5/2019 10:41:48 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – June 5, 2019 8 <br /> <br /> <br />Mr. Brausen stated 60 to 80 vehicles could run through the car wash in an hour. He anticipated <br />he would not have 80 vehicles at the site at any one time for a car wash. <br /> <br />Commissioner Lambeth questioned if the car wash had a grade or slope at the exit point. <br /> <br />Mr. Brausen reported the car wash would have the same grade as the convenience store. He <br />explained the entire car wash area would be heated. <br /> <br />Commissioner Lambeth thanked the applicant for providing heated pavement for the handicap <br />parking stalls. He stated this was a fantastic feature. <br /> <br />Mr. Brausen stated he was also looking at heating the sidewalks. <br /> <br />Commissioner Wicklund commented on the stacking for the car wash and requested staff use <br />the right size and scale of vehicles when this item goes before the City Council. <br /> <br />Chair Gehrig recommended Condition 1 be amended to read: shall require review and approval <br />by the City Council. <br /> <br />Chair Gehrig recommended Condition 22 be added to read: The applicant shall have a final <br />design for the car wash with stacking prior to the City Council meeting. <br /> <br />Commissioner Lambeth requested staff address the juniper tree situation with the applicant. <br /> <br />Commissioner Vijums moved and Commissioner Lambeth seconded a motion to <br />recommend approval of Planning Case 19-001 for a Site Plan Review and Final PUD at <br />1310 West County Road E based on the findings of fact and the submitted plans, as <br />amended by the twenty-two (22) conditions in the June 5, 2019, report to the Planning <br />Commission. The motion carried unanimously (5-0). <br /> <br />C. Zoning Code Amendment – Public Hearing Required <br /> <br />City Planner Mrosla stated the City has initiated proposed amendments to Chapter 13 – Zoning <br />Code to revise the existing “Floor Area” definition of the City Code. The amendment would <br />address the following: <br /> <br />1. The existing language below is not consistent with Minnesota State Building <br />Code requirements. <br /> <br />Floor area. The sum of the gross horizontal area of all floors of a building as <br />measured in square feet from the exterior sides of the exterior walls, or from <br />the centerline of party walls separating attached buildings, but not including <br />covered porches that meet the requirements in Section 1325.03 Subd. 2.D; <br />decks; any space where the average floor-to-ceiling height is less than six <br />feet; attached or detached garages; and other detached accessory structures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.