Laserfiche WebLink
_____________________________________________________________________________________________ <br />City of Arden Hills <br />Planning Commission Meeting for July 10, 2019 <br />P:\Planning\Planning Cases\2019\19-002 - Summit Development - PUD, CPA, RZ, PP, FP <br />Page 17 of 19 <br />Applicant will be responsible to carry out these operation and maintenance activities <br />and to submit the appropriate documentation to the City as specified. <br />16.Any future trash enclosures shall utilize wooden gates and be constructed on three <br />sides using the same materials and patterns used on the building. Locations shall be <br />approved by the Planning Department. <br />17.This approval does not include signs. A separate sign permit is required for all <br />proposed signage. All signage shall meet the requirements of Sign District 2. <br />18.Prior to the issuance of a building permit, a landscape financial security of $20,000.00 <br />dollars shall be submitted. Landscape financial security is held for two full growing <br />seasons. <br />19.Before construction, grading, or land clearing begins, trees or tree areas that are to be <br />preserved shall be visibly marked and city-approved tree protection fencing or other <br />method shall be installed and maintained at the critical root zones of the trees to be <br />protected. The location of the fencing shall be in conformance with the approved tree <br />preservation plan and approved by staff in writing. <br />20.All rooftop or ground mounted mechanical equipment shall be hidden from view with <br />the same materials used on the building in accordance with City Code requirements. <br />21.All fencing and retaining wall materials shall be complementary to the building <br />materials and shall be approved in writing by the Planning Division prior to issuance <br />of a building permit. Retaining walls greater than four (4) feet in height shall be <br />engineered and detailed calculations shall be submitted to the City. <br />22.Prior to City Council, the Applicant shall submit a materials board to be approved in <br />writing by staff. <br />23.A Grading and Erosion permit shall be obtained from the city’s Engineering Division <br />prior to commencing any grading, land disturbance or utility activities. The <br />Developer shall be responsible for obtaining any permits necessary from other <br />agencies, including but not limited to, MPCA, Rice Creek Watershed District, and <br />Ramsey County, MNDOT prior to the start of any site activities. <br />24.The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any <br />and all stormwater runoff, sediments and debris during all construction activities. <br />Temporary stormwater facilities shall be installed to protect the quality aspect of the <br />proposed and existing stormwater facilities prior to and during construction activities. <br />Maintenance of any and all temporary stormwater facilities shall be the responsibility <br />of the Applicant. <br />25.Prior to the issuance Grading and Erosion permit, the Engineering Department shall <br />review and approve final grading and utility plans in writing. <br />26.All proposed workout station equipment shall be approved by staff prior to the <br />issuance of a building permit. <br />27.The Applicant shall update the landscaping to meet the required tree mitigation prior <br />to the issuance of a Grading and Erosion control permit. <br />28.The property owners shall complete snow removal, maintenance and replacement of <br />all proposed sidewalks and trails unless a written agreement between the City and <br />owner establishes a different requirement.