Laserfiche WebLink
<br />City of Arden Hills <br />City Council Meeting for July 22, 2019 <br />P:\Planning\Planning Cases\2019\19-002 – Summit Development – CPA, RZ, SP, CUP, FPUD, PP, FP <br />Page 6 of 7 <br />18. Prior to the issuance of a building permit, a landscape financial security of $20,000.00 <br />dollars shall be submitted. Landscape financial security is held for two full growing <br />seasons. <br />19. Before construction, grading, or land clearing begins, trees or tree areas that are to be <br />preserved shall be visibly marked and city-approved tree protection fencing or other <br />method shall be installed and maintained at the critical root zones of the trees to be <br />protected. The location of the fencing shall be in conformance with the approved tree <br />preservation plan and approved by staff in writing. <br />20. All rooftop or ground mounted mechanical equipment shall be hidden from view with <br />the same materials used on the building in accordance with City Code requirements. <br />21. All fencing and retaining wall materials shall be complementary to the building <br />materials and shall be approved in writing by the Planning Division prior to issuance <br />of a building permit. Retaining walls greater than four (4) feet in height shall be <br />engineered and detailed calculations shall be submitted to the City. <br />22. Prior to City Council, the Applicant shall submit a materials board to be approved in <br />writing by staff. <br />23. A Grading and Erosion permit shall be obtained from the City’s Engineering Division <br />prior to commencing any grading, land disturbance or utility activities. The <br />Developer shall be responsible for obtaining any permits necessary from other <br />agencies, including but not limited to, MPCA, Rice Creek Watershed District, and <br />Ramsey County, MNDOT prior to the start of any site activities. <br />24. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and <br />all stormwater runoff, sediments and debris during all construction activities. <br />Temporary stormwater facilities shall be installed to protect the quality aspect of the <br />proposed and existing stormwater facilities prior to and during construction activities. <br />Maintenance of any and all temporary stormwater facilities shall be the responsibility <br />of the Applicant. <br />25. Prior to the issuance Grading and Erosion permit, the Engineering Department shall <br />review and approve final grading and utility plans in writing. <br />26. All proposed workout station equipment shall be approved by City staff prior to the <br />issuance of a building permit. <br />27. The Applicant shall update the landscaping plan to meet the required tree mitigation <br />prior to the issuance of a Grading and Erosion control permit. <br />28. The property owners shall complete snow removal, maintenance and replacement of <br />all proposed sidewalks and trails unless a written agreement between the City and <br />owner establishes a different requirement. <br />29. The property owner and the City shall come to an agreement on connecting the <br />proposed trial and the future trail upon opening the park space. <br /> <br />1. Approval without Conditions: Adopt a motion approving Planning Case 19-002 for a Site <br />Plan Review, Final Planned Unit Development, and Preliminary Plat at 1718, 1720, 1722 <br />Parkshore Drive and 4177 Old Highway 10, based on the findings of fact and submitted <br />plans to the City Council.