My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-19-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
07-22-19-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 9:04:02 AM
Creation date
7/18/2019 4:55:04 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
203060v1 <br />24.The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and <br />all stormwater runoff, sediments and debris during all construction activities. <br />Temporary stormwater facilities shall be installed to protect the quality aspect of the <br />proposed and existing stormwater facilities prior to and during construction activities. <br />Maintenance of any and all temporary stormwater facilities shall be the responsibility <br />of the Applicant. <br />25.Prior to the issuance Grading and Erosion permit, the Engineering Department shall <br />review and approve final grading and utility plans in writing. <br />26.All proposed workout station equipment shall be approved by City staff prior to the <br />issuance of a building permit. <br />27.The Applicant shall update the landscaping plan to meet the required tree mitigation <br />prior to the issuance of a Grading and Erosion control permit. <br />28.The property owners shall complete snow removal, maintenance and replacement of <br />all proposed sidewalks and trails unless a written agreement between the City and <br />owner establishes a different requirement. <br />29. The property owner and the City shall come to an agreement on connecting the <br />proposed trial and the future trail upon opening the park space. <br />2. The City Clerk is directed to record the conditional use permit with the County <br />Recorder/Registrar’s office. <br />PASSED and ADOPTED this 22nd day of July, 2019, by the City Council of the City <br />of Arden Hills, Minnesota. <br />CITY OF ARDEN HILLS <br />By _______________________________ <br />David Grant, Mayor <br />ATTEST: <br />_____________________________ <br />Julie Hanson, City Clerk
The URL can be used to link to this page
Your browser does not support the video tag.