|
Line No. Item No. Units QuantityUnit Price Total Price Unit Price Total Price Unit Price Total Price252540.601 EACH 2 $4,500.009,000.00$ 5,700.00$ 11,400.00$ 5,000.00$ 10,000.00$ 262557.501 LIN FT 346 $50.0017,300.00$ 90.00$ 31,140.00$ 62.00$ 21,452.00$ 272557.501 EACH 1 $875.00875.00$ 1,500.00$ 1,500.00$ 1,100.00$ 1,100.00$ 282557.501 EACH 1 $1,000.001,000.00$ 2,700.00$ 2,700.00$ 2,000.00$ 2,000.00$ 292563.601 LUMP SUM 1 $1,500.001,500.00$ 1,800.00$ 1,800.00$ 2,500.00$ 2,500.00$ 302564.602 EACH 1 $350.00350.00$ 925.00$ 925.00$ 300.00$ 300.00$ 312572.503 LIN FT 650 $4.502,925.00$ 6.00$ 3,900.00$ 9.00$ 5,850.00$ 322573.535 LUMP SUM 1 $1,500.001,500.00$ 1,700.00$ 1,700.00$ 2,500.00$ 2,500.00$ 332573.533 LIN FT 375 $5.001,875.00$ 8.00$ 3,000.00$ 7.50$ 2,812.50$ 342575.505 ACRE 0.30 $7,500.002,250.00$ 8,000.00$ 2,400.00$ 10,000.00$ 3,000.00$ 352575.504 SQ YD 1,460 $3.004,380.00$ 2.50$ 3,650.00$ 2.50$ 3,650.00$ 362582.501 LUMP SUM 1 $500.00500.00$ 925.00$ 925.00$ 500.00$ 500.00$ 372582.604 SQ YD 1,105 $10.0011,050.00$ 12.00$ 13,260.00$ 9.00$ 9,945.00$ TOTAL ROYAL HILLS214,349.20$ 268,888.00$ 313,129.50$ TOTAL BASE BID 241,943.20$ 303,782.00$ 353,409.50$ HAZELNUT PARK ‐ ALTERNATE12021.501 LUMP SUM 1 $5,704.985,704.98$ 6,800.00$ 6,800.00$ 10,000.00$ 10,000.00$ 22101.501 LUMP SUM 1 $1,500.001,500.00$ 4,100.00$ 4,100.00$ 5,000.00$ 5,000.00$ 32104.503 LIN FT 357 $10.003,570.00$ 11.50$ 4,105.50$ 13.00$ 4,641.00$ 42104.601 LUMP SUM 1 $500.00500.00$ 1,800.00$ 1,800.00$ 1,000.00$ 1,000.00$ 52104.603 LUMP SUM 1 $1,500.001,500.00$ 4,500.00$ 4,500.00$ 1,000.00$ 1,000.00$ 62104.504 SQ YD 1,125 $5.005,625.00$ 1.00$ 1,125.00$ 9.00$ 10,125.00$ 72104.507 CU YD 100 $30.003,000.00$ 133.00$ 13,300.00$ 25.00$ 2,500.00$ 82105.507 LUMP SUM 1 $4,950.004,950.00$ 23,200.00$ 23,200.00$ 18,000.00$ 18,000.00$ 92360.601 SQ YD 840 $35.0029,400.00$ 35.00$ 29,400.00$ 77.00$ 64,680.00$ 102360.604 SQ YD 335 $35.0011,725.00$ 47.70$ 15,979.50$ 80.00$ 26,800.00$ 112521.603 LIN FT 368 $20.007,360.00$ 53.00$ 19,504.00$ 32.00$ 11,776.00$ 122521.518 SQ FT 48 $8.00384.00$ 28.00$ 1,344.00$ 20.00$ 960.00$ 132531.603 LIN FT 356 $4.001,424.00$ 7.00$ 2,492.00$ 7.00$ 2,492.00$ 142540.601 EACH 1 $2,500.002,500.00$ 2,300.00$ 2,300.00$ 2,500.00$ 2,500.00$ 152557.501 LIN FT 345 $50.0017,250.00$ 90.00$ 31,050.00$ 62.00$ 21,390.00$ 162557.501 EACH 1 $875.00875.00$ 1,500.00$ 1,500.00$ 1,100.00$ 1,100.00$ 172557.501 EACH 1 $1,000.001,000.00$ 2,700.00$ 2,700.00$ 2,000.00$ 2,000.00$ 182563.601 LUMP SUM 1 $1,500.001,500.00$ 3,500.00$ 3,500.00$ 2,500.00$ 2,500.00$ 192572.503 LIN FT 805 $4.503,622.50$ 6.00$ 4,830.00$ 9.00$ 7,245.00$ 202573.533 LIN FT 521 $5.002,605.00$ 5.00$ 2,605.00$ 7.50$ 3,907.50$ 212573.535 LUMP SUM 1 $1,500.001,500.00$ 1,800.00$ 1,800.00$ 2,500.00$ 2,500.00$ 222575.505 ACRE 0.20 $7,500.001,500.00$ 12,600.00$ 2,520.00$ 10,000.00$ 2,000.00$ 232575.504 SQ YD 1,003 $3.003,009.00$ 2.50$ 2,507.50$ 2.50$ 2,507.50$ 242582.604 SQ YD 780 $10.007,800.00$ 12.00$ 9,360.00$ 9.00$ 7,020.00$ TOTAL HAZELNUT PARK ‐ ALTERNATE 119,804.48$ 192,322.50$ 213,644.00$ TOTAL BASE BID PLUS ALTERNATE 361,747.68$ 496,104.50$ 567,053.50$ ACRYLIC COLOR SURFACING (FOR COURT)EROSION CONTROL BLANKETBASKETBALL GOAL10' HIGH, 3‐RAIL CHAIN‐LINK PERIMETER FENCE8' HIGH, 4' WIDE GATE10' HIGH, 10' WIDE DOUBLE GATECLEARING AND GRUBBINGSEEDING ‐ TURF SEED MIXPARKING LOT STALL AND SYMBOL AT ADA STALLMOBILIZATIONREMOVE CHAIN‐LINK FENCEREMOVE TENNIS POSTS AND NETTRAFFIC CONTROLADA PARKING SIGNCONSTRUCTION FENCINGROCK CONSTRUCTION ENTRANCESEDIMENT CONTROL LOG, TYPE WOOD FIBER3" BITUMINOUS WALK WITH AGGREGATE BASE5" THICK X 18" WIDE CONCRETE MAINTENANCE STRIP4" THICK CONCRETE WALK WITH AGGREGATE BASEJOINT ADHESIVETENNIS NET AND POST SYSTEMREMOVE WOOD TIMBERSREMOVE PAVEMENTCOMMON BORROW COMMON EXCAVATION BITUMINOUS COURT PAVEMENT WITH AGGREGATE BASESEDIMENT CONTROL LOG, TYPE WOOD FIBERROCK CONSTRUCTION ENTRANCESEEDING ‐ TURF SEED MIXEROSION CONTROL BLANKETACRYLIC COLOR SURFACING (FOR COURT)10' HIGH, 3‐RAIL CHAIN‐LINK PERIMETER FENCE8' HIGH, 4' WIDE GATE10' HIGH, 10' WIDE DOUBLE GATETRAFFIC CONTROLCONSTRUCTION FENCINGENGINEERS ESTIMATE BITUMINOUS ROADWAYS G URBAN COMPANIESItemPAGE 2
|