My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-19-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
08-12-19-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2019 4:19:49 PM
Creation date
8/8/2019 4:19:15 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />38 <br />198575v4 <br /> C. Establish permanent vegetation; <br /> <br /> D. Prevent sediment damage to adjacent properties and other designated areas; <br /> <br /> E. Schedule of erosion and sediment control practices; <br /> <br /> F. Use of temporary sedimentation basins; <br /> <br /> G. Stabilization of steep slopes and bluffs; <br /> <br /> H. Control the storm water leaving a site; <br /> <br /> I. Stabilize all waterways and outlets; <br /> <br /> J. Protect storm sewers and outfalls from the entrance of sediment, debris and <br />trash; <br /> <br /> K. Control waste, such as discarded building materials, concrete truck washout, <br />chemicals, litter and sanitary waste that may adversely impact water quality; <br /> <br /> L. When working in or crossing water bodies, take precautions to contain <br />sediment; <br /> <br /> M. Re-stabilize utility construction areas as soon as possible; <br /> <br /> N. Protect paved roads from sediment and mud brought in from access routes; <br /> <br /> O. Dispose of temporary erosion and sediment control measures; <br /> <br /> P. Maintain all temporary and permanent erosion and sediment control practices; <br />and <br /> <br /> Q. Removal of sediment from streets at the end of each day <br /> <br /> Subd. 4 Plan Content. The Erosion and Sediment Control Plan content shall include the <br />following unless waived by the PWD: <br /> <br /> A. Contact information for the Permittee; <br /> <br /> B. Address of site where the land disturbing activity is proposed; <br /> <br /> C. Signature(s) of the owner(s) of the site or an authorized representative; <br /> <br /> D. Project description including the nature and purpose of the land disturbing <br />activity and the amount of grading involved;
The URL can be used to link to this page
Your browser does not support the video tag.