Laserfiche WebLink
TCAAP AUAR Update 2 <br />August 2019 <br />of a new pedestrian bridge over Rice Creek and a noise wall along I-35W <br />southbound between County Road I and County Road H2. Two roundabouts, <br />one at each ramp terminal on either side of I-35W, were constructed. <br />o Construction of the County Road I, Rice Creek Parkway, and Old Highway 8 <br />interchange was completed. Improvements included a roundabout, trail <br />access, raised medians, and a new stretch of roadway between County <br />Road H and County Road I referred to as the Thumb Road. <br />o Watermain and sanitary sewer needed for future development was installed <br />along the western edge of the AUAR study area as part of the County Road I <br />ramp reconstruction project. The watermain is located within the Thumb <br />Road alignment, crosses Rice Creek, and connects to the Mounds View <br />watermain along the west edge of the study area. The sanitary sewer is also <br />located within the Thumb Road alignment and extends from County Road H <br />to the northern boundary of the AUAR study area.