My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-05-19 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2019
>
06-05-19 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2019 10:20:56 AM
Creation date
9/4/2019 10:20:47 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – June 5, 2019 6 <br /> <br />9. The Applicant shall be responsible for obtaining any other permits necessary from other <br />agencies, including but not limited to, MPCA, Rice Creek Watershed District, and <br />Ramsey County prior to the start of any site activities. <br />10. All disturbed boulevards shall be restored with sod. <br />11. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />12. Prior to the issuance of a building permit, the Engineering Division shall review and <br />approve the utility plan in writing. <br />13. The Applicant shall provide a minimum stacking of four (4) vehicles for the car wash. <br />14. Bollards or a similar material shall be placed between the carwash queue and the <br />convenience store parking lot and gas pumps to clearly delineate the carwash queuing <br />area. <br />15. After three (3) months of car wash operation, the Applicant and staff shall review traffic <br />operations. The Applicant shall implement any improvements recommended by the City <br />Engineer at that time. <br />16. Bike racks shall be provided. <br />17. If the need is identified by the City, the proof of parking spaces shall be installed. <br />18. All light poles shall be a maximum of 25 feet in height, including base, and shall be <br />shoebox style, downward directed, with high-pressure sodium or LED lamps and flush <br />lens. Other than wash or architectural lighting, attached security lighting shall be shoebox <br />style, downward directed with flush lens. In addition, any entry lighting under canopies <br />shall be recessed and use a flush lens. Shields shall also be added as directed by the City. <br />19. No neon banding shall be permitted on the fuel canopy. <br />20. No exterior storage shall be permitted onsite. <br />21. Overnight vehicle storage is prohibited. All overnight vehicle storage shall be stored <br />indoors. <br /> <br />City Planner Mrosla reviewed the options available to the Planning Commission on this matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted. <br />3. Recommend Denial <br />4. Table <br /> <br />Chair Gehrig opened the public hearing at 6:59 p.m. <br /> <br />Chair Gehrig invited anyone for or against the application to come forward and make comment. <br /> <br />There being no comment Chair Gehrig closed the public hearing at 7:00 p.m. <br /> <br />Ted Brausen, Brausen Automotive Repair, stated his business has been in operation for the past <br />50 years. He explained he would be handing his family business over to his son and several <br />changes were being planned for the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.