My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-19-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2019
>
09-09-19-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 9:48:12 AM
Creation date
9/5/2019 4:26:33 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'It <br /> -AIPEN HILLS <br /> Approved: October 28, 2019 <br /> CITY OF ARDEN HILLS,MINNESOTA <br /> SPECIAL CITY COUNCIL WORK SESSION <br /> SEPTEMBER 9,2019 <br /> 7:00 P.M.-ARDEN HILLS CITY COUNCIL CHAMBERS <br /> CALL TO ORDER/ROLL CALL <br /> Pursuant to due call and notice thereof, Mayor David Grant called to order the Special City <br /> Council Work Session at 7:00 p.m. <br /> Present: Mayor David Grant, Councilmembers Dave McClung, Fran Holmes, and <br /> Steve Scott <br /> Absent: Councilmember Brenda Holden(excused) <br /> Also present: City Administrator Dave Perrault, Interim Public Works Director/City <br /> Engineer Todd Blomstrom, City Clerk Julie Hanson, Recreation Coordinator Sara Knoll, <br /> HRGreen Representatives Chris Harrington and Jordan Horejsi <br /> 1. AGENDA ITEMS <br /> A. Hamline Avenue Crosswalks and Retaining Walls <br /> Interim Public Works Director/City Engineer Blomstrom provided an overview of the <br /> Hamline Avenue pedestrian crossing project. He stated that one crosswalk is located at Wyncrest <br /> Court, and the second is about 1200 feet to the south at Floral Park. The retaining wall is located <br /> on both sides of Indian Oaks Trail. The existing crosswalk at Wyncrest is marked as a pedestrian <br /> crossing with a ramp on the west side but no ADA compliant facilities on the east side. The <br /> crossing at Floral Park is marked and has ramps on both sides. He noted previous discussions <br /> included installing center medians, changing the crosswalk configurations, additional signage and <br /> possible addition of a rectangular rapid flashing beacon. There was a design review meeting with <br /> Ramsey County staff and the consultant has final plans for the project. <br /> HRGreen Representative Horejsi referenced the handout and previous information that had <br /> been provided, along with the completed plans. He stated the ramp on the northwest quadrant will <br /> be replaced with full curb and the crossing will be removed. There will be a new ramp on the <br /> south side, including a pedestrian refuge, and a median refuge was added to the Floral crossing. <br /> HRGreen Representative Horejsi drew a cross section of the pedestrian refuge and described it <br /> in more detail. <br />
The URL can be used to link to this page
Your browser does not support the video tag.