My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-19-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
09-09-19-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 2:36:11 PM
Creation date
9/6/2019 2:35:44 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPINION OF PROBABLE PROJECT COST Attachment A <br />Hamline Avenue Crosswalk Project <br />August 8, 2019 <br />Prepared by HR Green <br />ITEM <br />NUMBER <br />ITEM DESCRIPTION <br />UNITS <br />UNIT COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />ESTIMATED <br />TOTAL COST <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$ 20,000.00 <br />1 <br />$ <br />20,000.00 <br />2102.518 <br />PAVEMENT MARKING REMOVAL <br />SQ FT <br />$ 3.00 <br />208 <br />$ <br />624.00 <br />2104.502 <br />REMOVE SIGN TYPE C <br />EACH <br />$ 75.00 <br />6 <br />$ <br />450.00 <br />2104.503 <br />SAWING BITUMINOUS PAVEMENT FULL DEPTH <br />LIN FT <br />$ 7.00 <br />190 <br />$ <br />1,330.00 <br />2104.503 <br />REMOVE CURB AND GUTTER <br />LIN FT <br />$ 13.00 <br />87 <br />$ <br />1,131.00 <br />2104.504 <br />REMOVE CONCRETE WALK <br />SQ YD <br />$ 12.00 <br />14 <br />$ <br />168.00 <br />2104.504 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$ 15.00 <br />95 <br />$ <br />1,425.00 <br />2104.618 <br />REMOVE AND REPLACE BITUMINOUS PAVEMENT <br />LIN FT <br />$ 75.00 <br />87 <br />$ <br />6,525.00 <br />2301.602 <br />DRILL AND GROUT REINFORCEMENT BAR EPDXY COATED <br />EACH <br />$ 35.00 <br />17 <br />$ <br />595.00 <br />2521.618 <br />CONCRETE WALK <br />SQ FT <br />$ 17.00 <br />803 <br />$ <br />13,651.00 <br />2531.603 <br />CONCRETE CURB AND GUTTER <br />LIN FT <br />$ 45.00 <br />229 <br />$ <br />10,305.00 <br />2531.618 <br />ITRUNCATED DOMES <br />SQ FT <br />$ 50.00 1 <br />103 <br />$ <br />5,150.00 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$ 5,000.00 <br />1 <br />$ <br />5,000.00 <br />2563.601 <br />ALTERNATE PEDESTRIAN ROUTE <br />LUMP SUM <br />$ 6,000.00 <br />1 <br />$ <br />6,000.00 <br />2564.502 <br />OBJECT MARKER TYPE X4-2 <br />EACH <br />$ 90.00 <br />4 <br />$ <br />360.00 <br />2564.618 <br />SIGN TYPE C <br />SQ FT <br />$ 40.00 <br />103 <br />$ <br />4,120.00 <br />2573.502 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />$ 175.00 <br />6 <br />$ <br />1,050.00 <br />2575.602 <br />SITE RESTORATION <br />EACH <br />$ 600.00 <br />4 <br />$ <br />2,400.00 <br />TOTAL CONSTRUCTION COST <br />$ <br />80,284.00 <br />Page 1 of 1 H RG reen <br />
The URL can be used to link to this page
Your browser does not support the video tag.