Laserfiche WebLink
CENTER STRIPING BETWEENEXISTING TENNIS POSTSCENTERLINE OF <br />BASKETBALL COURT TO <br />BE AT CENTER OF <br />EXISTING BASKETBALL <br />GOALS <br />CENTERLINE OF <br />TENNIS/ PICKLEBALL <br />COURTS TO OCCUR AT <br />CENTER OF EXISTING <br />TENNIS POSTS <br />TENNIS AND PICKLEBALL <br />COURT STRIPING, SEE DETAIL <br />4 <br />L6.3 <br />EXISTING FENCING TO REMAIN EQ.EQ.EQ.EQ.EXISTING 10' WIDE DOUBLE GATE TO REMAIN <br />FOR SHUFFLEBOARD COURT <br />STRIPING, SEE DETAIL <br />1 <br />L6.5 <br />CENTERLINE OF SHUFFLEBOARD <br />COURTS AND HOPSCOTCH <br />2 4 6 6 <br />665 <br />55FOR HOPSCOTCH STRIPING, <br />SEE DETAIL <br />2 <br />L6.5 <br />2 <br />2EXISTING TENNIS POST <br />EQ.EQ.CENTER STRIPING BETWEENEXISTING TENNIS POSTSEQ.EQ. <br />OUTER EDGE OF <br />COURT STRIPINGOUTER EDGE OFCOURT STRIPINGOUTER EDGE OFCOURT STRIPINGOUTER EDGE OFCOURT STRIPINGOUTER EDGE OFCOURT STRIPINGOUTER EDGE OFCOURT STRIPINGOUTER EDGE OFCOURT STRIPINGCORNER OF EXISTING COURT <br />OUTER EDGE OF <br />COURT STRIPING <br />CENTER OF COURT <br />STRIPE <br />OUTER EDGE OF <br />COURT STRIPING <br />6 6 CENTER OFCOURT STRIPE5 <br />FOR BASKETBALL COURT STRIPING, <br />SEE DETAIL <br />1 <br />L6.4CENTER OFCOURT STRIPEWSB PROJECT NO.: <br />SHEETC.P.REVISIONSNO.DATEDESCRIPTIONK:\014152-000\Cad\Plan\014152-000-L-SITE-PLAN.dwg 6/26/2019 8:25:23 AML3.0 <br />014152-000 <br />SCALE: <br />PLAN BY: <br />DESIGN BY: <br />CHECK BY: <br />AS SHOWN <br />JG <br />SF <br />SF <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED LANDSCAPE ARCHITECT UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:STEVEN D. FOSS06/26/201956852TENNIS COURT IMPROVEMENTS ATCUMMINGS, HAZELNUT AND RYAL HILLSPARKCITY OF ARDEN HILLSCUMMINGS PARK <br />SITE PLAN <br />19-PARK-001 <br />LEGEND: <br />ACRYLIC SURFACING <br />N <br />SCALE IN FEET <br />0 20 40 <br />CUMMINGS PARK SITE PLAN1 <br />L3.0 <br />NOTES: <br />1.STRIPING TO MATH EXISTING STRIPING. REFER <br />TO DETAILS FOR PICKLEBALL COURT STRIPING. <br />2.REFER TO SPECIFICATIONS FOR STRIPING AND <br />ACRYLIC SURFACING REQUIREMENTS. <br />3.CONTRACTOR IS RESPONSIBLE FOR SECURING <br />AREA UNTIL STRIPING/SURFACING PAINT HAS <br />DRIED.