My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-10-19 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2019
>
07-10-19 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 10:34:34 AM
Creation date
10/4/2019 10:34:23 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – July 10 , 2019 5 <br /> <br />24. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />25. Prior to the issuance Grading and Erosion permit, the Engineering Department shall <br />review and approve final grading and utility plans in writing. <br />26. All proposed workout station equipment shall be approved by staff prior to the issuance <br />of a building permit. <br />27. The Applicant shall update the landscaping to meet the required tree mitigation prior to <br />the issuance of a Grading and Erosion control permit. <br />28. The property owners shall complete snow removal, maintenance and replacement of all <br />proposed sidewalks and trails unless a written agreement between the City and owner <br />establishes a different requirement. <br /> <br />Community Development Manager/City Planner Mrosla reviewed the options available to <br />the Planning Commission on this matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted. <br />3. Recommend Denial <br />4. Table <br /> <br />Chair Gehrig opened the public hearing at 7:01 p.m. <br /> <br />Chair Gehrig invited anyone for or against the application to come forward and make comment. <br /> <br />George Winnicke, 4175 Old Highway 10, explained this property has been in his family’s name <br />for 109 years. He indicated he has seen the whole area develop over his lifetime. He commented <br />he put covenants in place to protect himself from apartments. He stated he was surprised by the <br />size of the proposed 4.5-acre park and questioned where the stormwater pond would be located. <br />He reported he originally had concerns with the proposed density but understood the site would <br />develop. He stated overall, he believed this was the best use for the site and requested the City <br />work with him further to iron out the outlot details. <br /> <br />Community Development Manager/City Planner Mrosla discussed how the City had received <br />4.5 acres of land for the proposed park. He then reviewed the location of the stormwater pond. <br /> <br />Justine Winnicke, _______________, questioned how much lighting would be involved in the <br />development. <br /> <br />Community Development Manager/City Planner Mrosla reported 25-foot-tall lighting would <br />be used and explained accent lighting would be placed on the buildings. He explained all <br />lighting would be downward facing. <br /> <br />Chuck McCann, 1682 Burberry, stated he lived in the adjacent townhouses. He asked if a noise <br />barrier would be put in place along the highway.
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).