Laserfiche WebLink
m3 STATE AID FOR LOCAL TRANSPORTATION Rev. February 2018 <br />CHANGE ORDER <br />IAHt1°tTaf1011 <br />SP/SAP(s) 187-020-021 MN Project No.: Change Order No.75-7 <br />---r <br />Project Location <br />j Old Snelling_ Trail, Count Road E, and E2 <br />Local Agency <br />Arden Hills <br />Local Project No. <br />Contractor <br />Sunram Contracting <br />Contract No. <br />_ <br />Address/City/State/Zip <br />J <br />20010 751h Ave north, Corcoran, MN 55340 <br />Total Change Order Amount $ 2,585.22 <br />During the construction of the project it was determined that a 4" Gate Valve with Box would have <br />to be installed to replace the existing gate valve in poor condition at Sta. 67+99 for the Valentine <br />Hills Elementary School water connection. Our project did not include this item as a bid item in <br />the original bid as this was not expected work that needed to be performed. <br />During construction, it was also determined that 5 Kleen Break Mounting systems would be <br />required for 5 salvaged signs on top of Walls 2 and 3. To meet ADA requirements, the signs had <br />to be moved outside of the newly constructed pedestrian trail and placed on top of the also newly <br />constructed retaining walls. These special mounting systems were necessary to secure the signs <br />to the top of the block walls. <br />Estimate Of Cost: (tnctuav any increases or decreases in contract items, arry nugotiatud of force account items) <br />Page 1 of 2 <br />