Laserfiche WebLink
CITY OF ARDEN HILLS <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />Project No. R-010111-000 <br />Pay Voucher No. 10 <br />R-010111-000 <br />Project Material Status <br />Quantity <br />Amount <br />Line <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />This <br />This <br />Quantity <br />Amount <br />Quantity <br />Pay <br />Pay <br />To Date <br />To Date <br />Voucher <br />Voucher <br />81 <br />2123.610 <br />UTILITY CREW <br />HOUR <br />$750.00 <br />10 <br />0 <br />$0.00 <br />1.3 <br />$975.00 <br />TEMPORARY <br />82 <br />2504.601 <br />WATER SERVICE - <br />LS <br />$5,700.00 <br />1 <br />0 <br />$0.00 <br />1 <br />$5,700.00 <br />A <br />TEMPORARY <br />83 <br />2504.601 <br />WATER SERVICE - <br />LS <br />$5,700.00 <br />1 <br />0 <br />$0.00 <br />1 <br />$5,700.00 <br />B <br />CONNECT TO <br />84 <br />2504.602 <br />EXISTING WATER <br />EACH <br />$1,265.00 <br />5 <br />0 <br />$0.00 <br />5 <br />$6,325.00 <br />MAIN <br />CONNECT TO <br />85 <br />2504.602 <br />EXISTING WATER <br />EACH <br />$350.00 <br />68 <br />0 <br />$0.00 <br />69 <br />$24,150.00 <br />SERVICE <br />86 <br />2504.602 <br />1" CORPORATION <br />EACH <br />$306.00 <br />68 <br />0 <br />$0.00 <br />69 <br />$21,114.00 <br />STOP <br />87 <br />2504.602 <br />BOX RB STOP & <br />EACH <br />$415.00 <br />68 <br />0 <br />$0.00 <br />68 <br />$28,220.00 <br />88 <br />2504.602 <br />INSTALL <br />EACH <br />$3,580.00 <br />14 <br />0 <br />$0.00 <br />14 <br />$50,120.00 <br />HYDRANT <br />89 <br />2504.602 <br />BOX TE VALVE & <br />EACH <br />$1,405.00 <br />14 <br />0 <br />$0.00 <br />14 <br />$19,670.00 <br />90 <br />2504.602 <br />BOX TE VALVE & <br />EACH <br />$1,866.00 <br />13 <br />0 <br />$0.00 <br />13 <br />$24,258.00 <br />91 <br />2504.602 <br />CURB BOX <br />EACH <br />$130.00 <br />5 <br />0 <br />$0.00 <br />2 <br />$260.00 <br />CASTING <br />92 <br />2504.603 <br />1" TYPE K <br />L F <br />$29.62 <br />2610 <br />0 <br />$0.00 <br />2641 <br />$78,226.42 <br />COPPER PIPE <br />6" WATERMAIN <br />93 <br />2504.603 <br />DUCTILE IRON CL <br />L F <br />$36.10 <br />190 <br />0 <br />$0.00 <br />195.5 <br />$7,057.55 <br />52 <br />94 <br />2504.603 <br />8" PVC C900 <br />L F <br />$31.61 <br />4470 <br />0 <br />$0.00 <br />4482 <br />$141,676.02 <br />WATER MAIN <br />8" PVC <br />95 <br />2504.603 <br />WATERMAIN <br />L F <br />$209.50 <br />60 <br />0 <br />$0.00 <br />60 <br />$12,570.00 <br />(DIRECTIONAL <br />DRILLED) <br />96 <br />2504.604 <br />4" POLYSTYRENE <br />S Y <br />$41.91 <br />70 <br />0 <br />$0.00 <br />62.45 <br />$2,617.28 <br />INSULATION <br />97 <br />2504.608 <br />DUCTILE IRON <br />LB <br />$3.73 <br />6130 <br />0 <br />$0.00 <br />5529 <br />$20,623.17 <br />FITTINGS <br />Totals For Section SCHEDULE C. WATER MAIN IMPROVEMENTS - <br />$0.00 <br />$489,994.44 <br />FULL RECONSTRUCTION AREA: <br />SCHEDULE D. DRAINAGE IMPROVEMENTS - FULL RECONSTRUCTION <br />AREA <br />98 <br />2104.501 <br />REMOVE SEWER <br />L F <br />$8.00 <br />810 <br />0 <br />$0.00 <br />922 <br />$7,376.00 <br />PIPE (STORM) <br />REMOVE <br />99 <br />2104.509 <br />DRAINAGE <br />EACH <br />$400.00 <br />7 <br />0 <br />$0.00 <br />8 <br />$3,200.00 <br />STRUCTURE <br />100 <br />2104.509 <br />REMOVE PIPE <br />EACH <br />$150.00 <br />3 <br />0 <br />$0.00 <br />2 <br />$300.00 <br />APRON <br />Page 7 <br />