My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-19-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2019
>
10-28-19-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 11:58:19 AM
Creation date
11/13/2019 11:58:08 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL — OCTOBER 28, 2019 7 <br />to conduct a topographic survey, develop a hydraulic model for existing storm sewer, review <br />alternatives, and provide recommendations to resolve the local flooding issues along Shorewood <br />Drive was reviewed with the Council. <br />Councilmember Holden asked if the estimated cost for these projects was reasonable. <br />Interim Public Works Director/City Engineer Blomstrom explained the projected expenses <br />were below the engineers estimate and were very reasonable for the extent of work that would be <br />completed. <br />MOTION: Councilmember McClung moved and Councilmember Holmes seconded a <br />motion to Approve Professional Services Agreements with HR Green for <br />Shorewood Drive (Survey and Storm Sewer Improvements Study) and Grant <br />Road & Fairview Avenue (Survey and Existing Stormwater Overflow Path <br />Assessment). <br />Councilmember Holden stated she did not understand what was reasonable or not reasonable for <br />this expense and therefore would not be supporting the motion. <br />Councilmember Holmes recommended billing rates and the estimated billable hours be included <br />in future proposals. <br />Councilmember Holden called the question. <br />The motion carried 4-1 (Councilmember Holden opposed). <br />8. PUBLIC HEARINGS <br />A. Planning Case 19-014 — Interim Use Permit — 1901 Lake Valentine Road <br />(Mounds View High School) <br />Community Development Manager/City Planner Mrosla stated Mounds View Public Schools <br />has applied for an Interim Use Permit (IUP) to allow the existing building on the property at 1901 <br />Lake Valentine Road to be temporarily used as the weight room/fitness center for Mounds View <br />High School. This property is zoned R-1, Single Family Residential and is part of the Mounds <br />View High School Planned Unit Development. <br />Community Development Manager/City Planner Mrosla commented when construction of the <br />high school improvements began, the School District realized they did not have an interim <br />location for the weight room/fitness center. This room is generally used for fitness and weight <br />training as part of the overall health and wellness curriculum. The school officials looked for a <br />temporary location and decided to use the existing building at 1901 Lake Valentine Road. The <br />School District worked with the Fire Marshall and building inspections staff to bring the space <br />into conformance with building and life safety codes. During that time school and planning staff <br />met to discuss approval options. As a result, the school district has submitted this application for <br />an IUP. A temporary certificate of occupancy has been issued, pending City Council approval of <br />
The URL can be used to link to this page
Your browser does not support the video tag.