My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-19-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
11-18-19-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 6:34:43 PM
Creation date
11/14/2019 6:33:35 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Effective 1/1/2020 <br />ELECTRICAL PERMIT FEES Exhibit “A” <br /> <br />HOMEOWNERS AND ELECTRICAL CONTRACTORS: Complete an electrical permit form available from the Building <br />Inspections Division. Add $1.00 for State surcharge to total cost of each permit. The fee is the total of the listed fees or the total number <br />of inspection trips x $45.00, whichever is greater. <br /> <br />Residential panel replacement is $110.00, sub <br />panel $45.00. New service or power supply is: Circuits and Feeders <br /> <br />0 to 300 Amp $55.00 0-100 Amp $9.00 <br />400 Amp $71.00 101-200Amp $15.00 <br />500 Amp $87.00 201-300 Amp $21.00 <br />600 Amp $103.00 301-400 Amp $27.00 <br />800 Amp $135.00 401-500 Amp $33.00 <br />1000 Amp $167.00 501-600 Amp $39.00 <br /> <br />Add $16.00 for each additional 100 amps Add $6.00 for each additional 100 amps <br /> <br />Minimum Fee: Maximum Fee: <br />Minimum permit fee is $45.00 plus $1.00 Maximum fee for single family dwelling or <br />State surcharge. This is for one inspection townhouse not over 200 amps (No max if <br />only. Minimum fee for rough-in and final service is over 200Amps) is $190.00 plus <br />inspection is $90.00 plus $1.00 State surcharge. $1.00 State surcharge. Maximum of 2 rough-in’s and 1 final <br /> inspection. (Failed inspections are an additional $45.00 each) <br />Apartment Buildings <br />Fee per unit of an apartment or condominium complex is $80.00. <br />This does not cover service, unit feeders or house panels. <br /> <br />Swimming Pools and Hot Tubs $90.00 plus circuits at $9.00/each. This includes 2 inspections. <br />Additions, Remodels or <br />Basement Finishes $90.00 this include up to 10 circuits and 2 inspections <br /> <br />Residential Accessory Structures The Greater of $55.00 for panel plus $9.00 per circuit or $90 for 2 <br />inspections. <br /> <br />Traffic Signals $8.00 per each standard <br />Street and Parking Lot Lights $5.00 per each standard <br /> <br />Transformers and Generators $5 up to 10kva, $40 11 to 74kva, $60 75kva to 299kva, over 299kva is <br />$165 <br /> <br />Retrofit Lighting $0.85 cents per fixture <br />Sign Transformer or Driver $9.00 per transformer <br /> <br />Low voltage fire alarm, low voltage heating $0.85 cents per device <br />and air conditioning control wiring <br /> <br />Re-Inspection Fee in addition $45.00 <br />to all other fees <br /> <br />Hourly rate for carnivals $90.00 <br /> <br />Solar fees: <br />0kw to 5kw = $90 5.1kw to 10kw = $150 <br />10.1kw to 20kw = $225 20.1kw to 30kw = $300 <br />30.1kw to 40kw = $375 40.1kw and larger is $375 plus $25 for each additional 10kw <br /> <br />Electronic inspection fee for these items only; furnace, air conditioning, bath fan, fireplace or receptacle for water <br />heater vent is $40. <br /> <br />Refunds must be requested in writing. No refunds unless more than the minimum fee. Refunds are minus the cities 20% handling fee. <br /> <br />THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED.
The URL can be used to link to this page
Your browser does not support the video tag.