My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-19-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
11-18-19-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 6:34:43 PM
Creation date
11/14/2019 6:33:35 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--HHEATING &&CCOOLING TURNKEY SOLUTIONS--(A) Chiller system located in the South Courtyard (Recommended Option):$353,898Provides a redundant cooling source to entire buildingMost reliable source of equipmentOptimized control strategies and comfort in building spaceAllows for highest potential on custom rebates(B) Condensing units relocated to meet ASRE/Factory Requirements:$ 335,825Requires relocation to be within Factory and ASRE guidelinesNo redundant coolingLimited control strategies to optimize space temperature swings(C)Condensing units replaced in current location (Not Recommended):$ 243,111Equipment Warranty void on equipment due to line set length exceeding ASRE/Factory install guidelines Limited control strategies to optimize space temperature swingsCAUTION! reliability of equipment is unknown extensive and premature failures likely(Engineering, Design, Equipment, Coordination, PM, Demo, Electrical, Pipefitting, Controls, GC, Service Contract) Heating SolutionCooling Solutions(A) High Efficient Boiler(s) with Domestic Hot Water Heat Exchanger$ 140,95497% efficiency boilersRedundant heating for domestic and building heatCustom rebate with control strategies from Xcel
The URL can be used to link to this page
Your browser does not support the video tag.