Laserfiche WebLink
Storm Pond MaintenanceSurface <br />...................................................................................................................................................................._.................................................................................................................._.................................................. <br />Water Mgmt <br />$100,000 <br />Shorewood Drive drainage improvements ...................._............................................. <br />Surface Water Mgmt <br />$50,000 <br />Replace 2010 Bobcat Toolcat <br />...................................................................................................................................................................._.................................................................................................................._.................................................. <br />Equip/Bldg Replacement <br />$40,000 <br />Replace 2012 F-350 TruckEquip/Bldg <br />...................................................................................................................................................................._.................................................................................................................._.................................................. <br />Replacement <br />$48,000 <br />Replace 2010 F7350 Truck <br />EquipBldg Replacement <br />............................ <br />$46,000 <br />................................................... <br />Enterprise Funds <br />The City has four enterprise funds that finance business -type activities. A rate study was completed <br />in 2018 for the Water, Sewer and Surface Water Management funds. The recommended rate <br />increases are reflected in the revenue budgets and will be included on the 2020 Fee Schedule for the <br />City. The proposed increases are as follows: Water — 3%; Sewer — 6.5%; Storm — 3%. The drinking <br />water service connection fee enforced by the State is being increased from $1.59 to $2.43 per quarter. <br />Below is a comparison of utility fees for 2019 and 2020 based on proposed rates and for a household <br />using 9,000 gallons per quarter with a3/4" meter size or smaller. <br />2019 2020 <br />Water <br />70.79 <br />73.74 <br />Sewer <br />102.57 <br />109.27 <br />Storm <br />15.16 <br />15.61 <br />TOTAL <br />188.52 <br />198.62 <br />Property Values, Taxes and Tax Rates <br />According to information provided by Ramsey County, the median home value in Arden Hills will <br />increase from $346,900 for 2019 taxes to $372,400 for 2020 taxes, an increase of 7.4%, which is <br />less than the countywide average of 8.3%. The annual impact of a 5% City levy increase to a <br />residential homes is as follows (City tax amount only): <br />Set levy at $4,135,340 (an increase of $196,920 or 5.0% over 2019) <br />The 2019 City Tax Rate is 25.555%. The estimated City tax rate based on the most current <br />information with a 5% levy increase is 25.176%. <br />