My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-19-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
12-09-19-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 2:18:56 PM
Creation date
12/5/2019 2:13:57 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ARDEN HILLS, MINNESOTA 2020 BUDGET <br />Function: Public Works Fund # 604 <br />Activity: Surface Water Management Activity # 49550 <br />Activity Scope <br />The Surface Water Management Utility Fund is a self-sustaining fund, or enterprise fund of the City. The <br />function of the Surface Water Management (SWM) utility is the collection, treatment and disposition of storm <br />water as well as the maintenance of the storm sewers. The current fee structure is based upon zoning <br />classification and parcel acreage. Collection of these fees is done through the utility billing process. <br />Objectives <br />1. Maintain the storm water system including pipes and ponds in an appropriate manner. <br />2. Continue to make environmental improvements to the surface water system whenever cost-effectively <br />Issues <br />1. Budget constraints. <br />2. Increased State and Federal regulations. <br />Budget Commentary <br />The 2020 operating budget is a decrease of 0.7% from the previous year's budget with an increase of 11.1 % <br />overall with capital outlay. The capital outlay budgeted for in 2020 includes pond maintenance, a Karth Lake <br />project, street drainage issues and the storm water portion of future street improvements. An operating transfer <br />($74,000) has also been budgeted to the Equipment, Building, and Replacement Fund. <br />Expenditures by Classification <br />7% 26% <br />31% DPersonnel Services <br />oCommodities <br />oContractual Services <br />oCapital Outlay <br />■Other Charges <br />35% <br />60 <br />2017 <br />2018 <br />2019 <br />2020 <br />Budget Summary <br />ACTUAL <br />ACTUAL <br />BUDGET <br />BUDGET <br />Personnel Services <br />$ 199,350 <br />$ 200,425 <br />$ 252,160 <br />$ 256,160 <br />Commodities <br />1,683 <br />6,820 <br />5,000 <br />7,500 <br />Contractual Services <br />279,990 <br />291,805 <br />348,800 <br />338,000 <br />Capital Outlay <br />- <br />- <br />200,000 <br />302,000 <br />Other Charges <br />65,499 <br />74,000 <br />74,000 <br />74,000 <br />Total <br />$ 546,522 <br />$ 573,049 <br />$ 879,960 <br />$ 977,660 <br />Percent Change <br />4.9% <br />53.6% <br />11.1% <br />Full -Time Equivalent positions <br />2.08 <br />2.30 <br />2.59 <br />2.63 <br />Expenditures by Classification <br />7% 26% <br />31% DPersonnel Services <br />oCommodities <br />oContractual Services <br />oCapital Outlay <br />■Other Charges <br />35% <br />60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.