Laserfiche WebLink
ELECTRICAL PERMIT FEES <br />Effective 1/1/2020 <br />Exhibit "A" <br />HO O ERS AND ELECTRICAL CONTRACTORS: Complete an electrical permit form available from the Building <br />Inspections Division. Add $1.00 for State surcharge to total cost of each permit. The fee is the total of the listed fees or the total number <br />of inspection trips x $45.00, whichever is greater. <br />Residential panel replacement is $110.00, sub <br />panel $45.00. New service or power supply is: <br />Circuits and Feeders <br />0 to 300 Amp <br />$55.00 <br />0-100 Amp <br />$9.00 <br />400 Amp <br />$71.00 <br />101-200Amp <br />$15.00 <br />500 Amp <br />$87.00 <br />201-300 Amp <br />$21.00 <br />600 Amp <br />$103.00 <br />301-400 Amp <br />$27.00 <br />800 Amp <br />$135.00 <br />401-500 Amp <br />$33.00 <br />1000 Amp <br />$167.00 <br />501-600 Amp <br />$39.00 <br />Add $16.00 for each additional 100 amps <br />Minimum Fee: <br />Minimum permit fee is $45.00 plus $1.00 <br />State surcharge. This is for one inspection <br />only. Minimum fee for rough -in and final <br />inspection is $90.00 plus $1.00 State surcharge <br />Add $6.00 for each additional 100 amps <br />Maximum Fee: <br />Maximum fee for single family dwelling or <br />townhouse not over 200 amps (No max if <br />service is over 200Amps) is $190.00 plus <br />$1.00 State surcharge. Maximum of 2 rough-in's and 1 final <br />inspection. (Failed inspections are an additional $45.00 each) <br />Apartment Buildings <br />Fee per unit of an apartment or condominium complex is $80.00. <br />This does not cover service, unit feeders or house panels. <br />Swimming Pools and Hot Tubs $90.00 plus circuits at $9.00/each. This includes 2 inspections. <br />Additions, Remodels or <br />Basement Finishes $90.00 this include up to 10 circuits and 2 inspections <br />Residential Accessory Structures <br />Traffic Signals <br />Street and Parking Lot Lights <br />Transformers and Generators <br />Retrofit Lighting <br />Sign Transformer or Driver <br />Low voltage fire alarm, low voltage heating <br />and air conditioning control wiring <br />Re -Inspection Fee in addition <br />to all other fees <br />Hourly rate for carnivals <br />The Greater of $55.00 for panel plus $9.00 per circuit or $90 for 2 <br />inspections. <br />$8.00 per each standard <br />$5.00 per each standard <br />$5 up to 10kva, $40 11 to 74kva, $60 75kva to 299kva, over 299kva is <br />$165 <br />$0.85 cents per fixture <br />$9.00 per transformer <br />$0.85 cents per device <br />$45.00 <br />$90.00 <br />Solar fees: <br />Okw to 5kw = $90 5.1 kw to 10kw = $150 <br />10.1 kw to 20kw = $225 20.1 kw to 30kw = $300 <br />30.1 kw to 40kw = $375 40.1 kw and larger is $375 plus $25 for each additional 10kw <br />Electronic inspection fee for these items only; furnace, air conditioning, bath fan, fireplace or receptacle for water <br />heater vent is $40. <br />Refunds must be requested in writing. No refunds unless more than the minimum fee. Refunds are minus the cities 20% handling fee. <br />THE PERMIT FEE IS DOUBLED IF THE WO K STARTS BEFORE THE PERMIT IS ISSUED. <br />