Laserfiche WebLink
Zoning, Sign, or Subdivision <br />Decisions <br />TCCAP Development Related <br />Professional Services Charge <br />VII. Public Work; <br />Right -of -Way Permit <br />Right -of Way Permit — Small <br />Cell Wireless Facilities <br />Grading & Erosion Control Fees <br />Escrow <br />Any portion of the TCAAP <br />development can prepay an <br />amount on behalf of future <br />parcels to be developed and that <br />the prepayment amount will be <br />netted out and the fee schedule <br />will be undated annually. <br />Permit Fee <br />Escrow <br />Permit for up to 15 locations; <br />rent and maintenance per each <br />location <br />Permit Fee <br />Escrow <br />VIII. Utility Hookup Charges <br />Water Permits — Service Per inspection <br />Installation/Revairs/Alteration <br />Water Permits — Interior <br />Plumbing, New Home <br />Water Permanent Disconnect <br />Curb Box and Service Lead, 1" <br />Service Connection on <br />Unsurfaced Street <br />Restoration of Typical Road Mix <br />Street <br />Restoration of Higher -Type <br />Street <br />Larger than 1" Service <br />Connection <br />Water Permits — Plan Check Fee <br />Water Permits — Re -inspection <br />Hydrant Meter Rental <br />Water Meter/Spacer Charges — <br />Customer Requested Water <br />Meter Accuracy Test <br />Water Meter/Spacer Charges — <br />5/8" x 3/4" Meter Model 25 <br />Fee includes removal of meter, <br />bench test at maintenance <br />facility, and returning meter to <br />residence; Fee will not be applied <br />if the meter is found to be <br />inaccurate to a degree exceeding <br />three percent (3%) from the <br />result of the bench test <br />Standard Meter <br />$1,000 <br />$2,743 per acre <br />$150 <br />To be determined by the <br />Engineer <br />$150 ROW permit fee, rent $150 <br />per year, maintenance $25 per <br />year <br />$150 <br />To be determined by the <br />Engineer <br />$40.00 <br />$40.00 <br />$215.00 <br />$165.00 <br />$105.00 <br />Set by Engineer <br />Set by Engineer <br />Set by Engineer <br />$40.00 <br />$2,000 deposit, monthly rental of <br />$30.00, water permit fee of <br />$170.00, State surcharge of $1.00 <br />plus applicable standard water <br />usage rate charge for <br />Based on Meter Size <br />Contact Public Works for Quote <br />$ $470.00 <br />Page 6 of 10 <br />