Laserfiche WebLink
ARDEN HILLS CITY COUNCIL—NOVEMBER 25, 2019 5 <br /> Associate Planner Hartmann reported the Planning Commission reviewed this application at <br /> their November 6, 2019 meeting. At that time, the Commission recommended approval by a 5-0 <br /> vote of the Mounds View School Districts application for Site Plan Review and Conditional Use <br /> Permit amendment, based on the suggested findings of fact and subject to following conditions: <br /> 1. All conditions of the original Conditional Use Permit shall remain in full force and effect. <br /> The Conditional Use Permit Amendment approvals shall expire one year from the date of <br /> City Council approval unless a building permit has been requested or a time extension has <br /> been granted by the City Council. <br /> 2. The project shall be completed in accordance with the plans submitted as amended by the <br /> conditions of approval. Any significant changes to the plans, as determined by the City <br /> Planner, shall require review and approval by the Planning Commission and City Council. <br /> 3. A Grading and Erosion permit shall be obtained from the city's Engineering Division prior <br /> to commencing any grading, land disturbance or utility activities. The Applicant shall be <br /> responsible for obtaining any permits necessary from other agencies, including but not <br /> limited to, MPCA, Rice Creek Watershed District, and Ramsey County prior to the start of <br /> any site activities. <br /> 4. Heavy duty silt fence and adequate erosion control around the entire construction site shall <br /> be required and maintained by the Developer during construction to ensure that sediment <br /> and storm water does not leave the project site. <br /> 5. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br /> infrastructure and components and any existing storm sewer from exposure to any and all <br /> stormwater runoff, sediments and debris during all construction activities. <br /> 6. Prior to the issuance of a Grading and Erosion permit, the Engineering Department shall <br /> review and approve final grading and utility plans in writing. <br /> 7. Prior to the issuance of a building permit, a landscape financial security of$2,500 shall be <br /> submitted. Landscape financial security shall be held for two full growing seasons. <br /> 8. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br /> same materials used on the building in accordance with City Code requirements. <br /> 9. Prior to the issuance of a building permit, the Applicant shall submit a materials board to <br /> be approved in writing by staff. <br /> 10. All light poles, including base, shall be a maximum of 25 feet in height and shall be <br /> shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br /> lenses. Other than wash or architectural lighting, attached security lighting shall be <br /> shoebox style, downward directed with flush lenses. If complaints are received the <br /> lighting adjacent to residential uses shall utilize house shields as directed by the City. In <br /> addition, any lighting under canopies (building entries) shall be recessed and use a flush <br /> lens. <br /> MOTION: Councilmember McClung moved and Councilmember Holmes seconded a <br /> motion to approve Planning Case 19-010 for a Site Plan Review and <br /> Conditional Use Permit for Valentine Hills Elementary School located at 1770 <br /> County Road E2 W, based on the findings of fact and the submitted plans in <br /> the November 25,2019 Report to the City Council. <br />