Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION – July 10 , 2019 5 <br /> <br />24. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />25. Prior to the issuance Grading and Erosion permit, the Engineering Department shall <br />review and approve final grading and utility plans in writing. <br />26. All proposed workout station equipment shall be approved by staff prior to the issuance <br />of a building permit. <br />27. The Applicant shall update the landscaping to meet the required tree mitigation prior to <br />the issuance of a Grading and Erosion control permit. <br />28. The property owners shall complete snow removal, maintenance and replacement of all <br />proposed sidewalks and trails unless a written agreement between the City and owner <br />establishes a different requirement. <br /> <br />Community Development Manager/City Planner Mrosla reviewed the options available to <br />the Planning Commission on this matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted. <br />3. Recommend Denial <br />4. Table <br /> <br />Chair Gehrig opened the public hearing at 7:01 p.m. <br /> <br />Chair Gehrig invited anyone for or against the application to come forward and make comment. <br /> <br />George Winnicke, 4175 Old Highway 10, explained this property has been in his family’s name <br />for 109 years. He indicated he has seen the whole area develop over his lifetime. He commented <br />he put covenants in place to protect himself from apartments. He stated he was surprised by the <br />size of the proposed 4.5-acre park and questioned where the stormwater pond would be located. <br />He reported he originally had concerns with the proposed density but understood the site would <br />develop. He stated overall, he believed this was the best use for the site and requested the City <br />work with him further to iron out the outlot details. <br /> <br />Community Development Manager/City Planner Mrosla discussed how the City had received <br />4.5 acres of land for the proposed park. He then reviewed the location of the stormwater pond. <br /> <br />Justine Winnicke, _______________, questioned how much lighting would be involved in the <br />development. <br /> <br />Community Development Manager/City Planner Mrosla reported 25-foot-tall lighting would <br />be used and explained accent lighting would be placed on the buildings. He explained all <br />lighting would be downward facing. <br /> <br />Chuck McCann, 1682 Burberry, stated he lived in the adjacent townhouses. He asked if a noise <br />barrier would be put in place along the highway.