Laserfiche WebLink
City of Arden Hills <br />Planning Commission Meeting for November 6, 2019 <br />P:\Planning\Planning Cases\2019\19-010 - Valentine Hills Elementary School\Memos Reports <br />Parking Plan <br />Valentine Hill Elementary School currently has 38 classrooms and 75 staff persons. The existing <br />site has 87 parking stalls. The proposed addition is not anticipated to generate additional parking <br />demand on site because the addition will support existing academic programs and staff levels. The <br />Applicant submitted a proof of parking plan show below. The proof of parking plan demonstrates <br />that an additional 77 parking spaces could be made available on the south side of the lot if needed <br />for events. <br />Design Standards <br />The proposed additions are utilizing the same materials as the existing building and the overall <br />design of the proposed addition complements the existing architectural theme found on site. Brick <br />is the primary material used on the proposed addition. To ensure the materials match the existing <br />building, staff is requiring the Applicant to provide a materials board prior to the issuance of a <br />building permit.