Laserfiche WebLink
LANDSCAPE ARCHITECTURE SITE PLANNING CIVIL ENGINEERINGANDERSON - JOHNSONASSOCIATES,INC.7575 GOLDEN VALLEY ROAD SUITE 200 MINNEAPOLIS. MN 55427FAX (763) 544-0531 PH (763) 544-7129DateRegistration NumberCheckDrawnDate:CommI hereby certify that this plan, specification or report was prepared byme or under my direct supervision and that I am a duly Licensedunder the laws of the State ofRevisionsDescriptionDateNumScale:NorthSITE DETAILSDAVID A. REY11/08/194018017226711/08/19CWFDAR1" = 30'C2.11CITY RESUBMITTAL 10/8/19MINNESOTAPROFESSIONAL ENGINEERISD #621: MOUNDS VIEWPUBLIC SCHOOLS4570 VICTORIA STREET NSHOREVIEW, MN 551261770 County Road E2 WArden Hills, Minnesota 55112VALENTINE HILLSELEMENTARYSCHOOL BUILDINGADDITIONSPIPE BEDDING - PVCNOTES:TRENCH SIDEWALLS TO MEET O.S.H.A REQUIREMENTS.UPPER 3 FT. OF BACKFILL SHALL BE COMPACTED TO AT LEAST 100%STANDARD PROCTOR DRY DENSITY. BELOW THIS ELEVATION, BACKFILLSHALL BE COMPACTED TO AT LEAST 95% STANDARD PROCTOR DRY DENSITY.SEWER INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM D2321.DEPTH (VARIES)6" MIN.1/8 O.D.(6" MIN.)O.D. + 2' (MAX)PIPE DIA.FINAL SUBGRADEHAND TAMPEDSANDC2.1111SILT FENCENORMAL USEPOSTS:(IF USED WITHOUTSUPPORT FENCE) WOOD2" SQ. (MIN)@ 4' (MAX)SPACING METAL0.95 lbs/lf (MIN.) @ 6'(MAX) SPACINGDIRECTION OFRUNOFF FLOWNOTE: DEPENDING UPON CONFIGURATION, ATTACH TO WIRE MESH WITHHOG RINGS, STEEL POSTS WITH TIE WIRES, OR WOOD POSTS WITH STAPLES5' MIN. LENGTH POST (METAL)4' MIN. LENGTH POST (WOOD)SILT FENCE FABRICOVERLAP FABRIC 6" ANDFASTEN @ 2' INTERVALSEXTEND WIRE MESH INTO TRENCHFABRIC ANCHORAGETRENCH BACKFILL WITHTAMPED NATURAL SOIL6" MIN.6" MIN.NATURAL SOIL24" MIN. BURY DEPTH (METAL)18" MIN BURY DEPTH (WOOD)30" MIN.METAL STAKE ORWOOD POSTOPTIONAL SUPPORTFENCE (WIRE MESH)6"6"12"6"2.4.5.3B.1.3A.EROSION CONTROL BLANKET1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARYAPPLICATION OF LIME, FERTILIZER, AND SEED.2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDETRENCH WITH APPROXIMATELY 12" OF BLANKET EXTENDED BEYOND THE UP-SLOPEPORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKESAPPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACTTHE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING12" PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKETOVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12"APART ACROSS THE WIDTH OF THE BLANKET.3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETSSHALL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETSMUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES INAPPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USINGOPTIONAL DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THECOLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 6"OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACETHE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVENWITH THE COLORED SEAM STITCH ON THE PREVIOUSLY INSTALLED BLANKET.5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END(SHINGLE STYLE) WITH AN APPROXIMATE 6" OVERLAP. STAPLE THROUGH OVERLAPPEDAREA, APPROXIMATELY 12" APART ACROSS ENTIRE BLANKET WIDTH.6. BLANKET SHALL BE STAPLED AS PER MANUFACTURER'S RECOMMENDATION.NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE ORSTAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARYTO PROPERLY SECURE THE BLANKETS.6"SEDIMENT CONTROL LOGFLOW24" MIN. <br />2' <br /> <br />O <br />. <br />C <br />. <br />M <br />A <br />X <br />.FLOWFLOWSTAKE DETAILINSTALLATION DETAILSEDIMENT CONTROL LOGSTAKE TO BE PLACED AT TOEOF SLOPE, BOTH SIDESWOOD STAKEBOTTOM OF SWALEWOOD STAKE TOPENETRATE NETTINGMATERIAL ONLYSEDIMENT CONTROL LOGCATCH BASINVARIESFLOWFLOW61"RIM ELEVATION"PRECAST COVER -8" THICKSTEPS - INSTALL ONDOWNSTREAM SIDE@ 16" O.C.RUBBER GASKET -TYP AT ALL JOINTSPRECAST CONCRETESECTIONGROUT SHELF ANDCHANNELSBASES SHALL BE 8"STANDARD PRECASTWITH 2" LEAN GROUT,OR POURED 8" SLABREINFORCED WITH6" x 6" 10/10 MESHPROVIDE FLEXIBLE JOINTAT CONNECTION -REFER TO SPECSSTORM SEWER PIPE- REFER TOPLAN FOR LOCATION, INVERT,AND SIZESMIN. 2 AND MAX. 5 ADJUSTINGRINGS. GROUT BETWEENRINGS, CASTING, AND ALONGOUTSIDE.METAL SEWER CASTING - REFERTO PLAN FOR TYPESTORM SEWER MANHOLE48"FLOWFLOW61BASES SHALL BE 8" STANDARD PRECAST WITH 2" LEAN GROUT,OR POURED 8" SLAB REINFORCED WITH 6" x 6" 10/10 MESHCOVER SHALL BESTAMPED"STORM SEWER""RIM ELEVATION"PRECAST COVER -8" THICKSTEPS - INSTALL ONDOWNSTREAM SIDE@ 16" O.C.RUBBER GASKET -TYP AT ALL JOINTSPRECAST CONCRETESECTIONPROVIDE FLEXIBLEJOINT - REFER TOSPECSGROUT SHELF ANDCHANNELSPROVIDE FLEXIBLE JOINT -REFER TO SPECSSTORM SEWER PIPE - SEEPLAN FOR LOCATION,INVERT, AND SIZESMIN. 2 AND MAX. 5 ADJUSTINGRINGS. GROUT BETWEENRINGS, CASTING, AND ALONGOUTSIDE.METAL SEWER CASTING - REFERTO PLAN FOR TYPERCP FLARED END SECTION(FES)PIPE SIZE21" & LESS24" TO 36"42" TO 54"60" & GREATER"U" BOLT DIA.1/2"5/8"3/4"1"WIDTH24"24"24"24""U" BOLT REQUIREMENTSNOTES:2 - "U" BOLT FASTENERS TO BE INSTALLED ACROSS EACHJOINT, ONE EACH SIDE OF PIPE AT 60° FROM THE TOP OFTHE PIPE. FASTEN FIRST THREE JOINTS AS SHOWN.CONCRETE PIPE TIES ("U" BOLTS)TRASH GUARD WITH 5/8" DIA.RODS AT 6" ON CENTER.FASTEN TO FES WITH 3HOT DIPPED GALV. CLIPSRIPRAP - REFERTO DETAILTYPICAL SECTION THRUFILTRATION AREAFILTRATION AREALIMITS AS SHOWN ON PLANSEE NOTE 7 OF 11 / C7.1 FOR ENGINEERED SOIL MIXTUREPLACE SEDIMENT LOG AT EDGE OF FILTRATION AREA - FULLPERIMETER , AND REMOVE ONCE ALL UPSLOPE AREAS AREFULLY STABILIZED (PERMANENT STABILIZATION)FLAT BOTTOM11EXCAVATE TO SUBGRADEELEVATION WITH A TOOTHEDBUCKET BACKHOE. RIP SOILS 6"TO 9" TO REMOVE COMPACTIONUTILITY TRACERWIRE (TYPICAL)6" DRAIN TILE WITH 3" MIN. PEA ROCKSURROUNDING, WRAPPED IN GEOTEXTILE FABRIC- REFER TO PLAN FOR LOCATION AND INVERT6" MIN.GRASSFILTRATION SYSTEM SOILMIXTURE - SEE BELOW6" DEPTHTOPSOILMINERAL SOD30" MIN.IMPERMEABLELINERPIPE BEDDING - RCP & DIPNOTES:TRENCH SIDEWALLS TO MEET O.S.H.A REQUIREMENTS.UPPER 3 FT. OF BACKFILL SHALL BE COMPACTED TO AT LEAST 100%STANDARD PROCTOR DRY DENSITY. BELOW THIS ELEVATION, BACKFILLSHALL BE COMPACTED TO AT LEAST 95% STANDARD PROCTOR DRY DENSITY.DEPTH (VARIES) <br />1/8 DEPTH (12" MIN.)1/6 O.D. <br />1/8 O.D. (4" MIN.)O.D. + 2' (MAX)FINAL SUBGRADELIGHTLYCOMPACTEDFILLCOMPACTED CRUSHED ROCKOR PEA GRAVEL - 100% PASSINGTHE 34" SIEVE AND A MAXIMUMOF 5% PASSING THE #10 SIEVE.BACKWATER VALVEFLOWBACKWATER VALVESOLVENT WELD BACKWATERVALVE TO DRAINTILEPROVIDE FLEXIBLE JOINT -REFER TO SPECS6" DRAINTILECONNECT DRAINTILE TOSTRUCTURE AT ELEVATIONSHOWN ON THE DRAWING.GROUT SECURE TO STRUCTUREWALLMINIMIZE STUB THROUGH WALL.STUB ONLY AS REQUIREDTO ALLOW BACKWATER VALVETO BE CONNECTED TO DRAINTILEPROVIDE FLEXIBLEJOINT ATCONNECTION -REFER TO SPECSREFER TO PLAN FORSTRUCTURE TYPE14C2.11ENGINEERED FILL10" <br />6"UNSUITABLE SOILTOPSOIL1'-0" (TYP)3'-0"11VARIESNOTE:BOTTOM OF EXCAVATION MUST BE APPROVED BY THE SOILSENGINEER PRIOR TO PLACEMENT OF ANY FILL.4" SLAB AND 6" SAND SUBBASE - VERIFYWITH ARCHITECTURAL PLANSFINISH FLOORFINISH SUBGRADEFINISH GRADE (TURF)MINIMUM EXCAVATIONLIMITSFOOTINGSUITABLE SOILENGINEERED FILL9C2.11SAND SUBBASE/ DRAIN TILE ATDOORS & FROST FOOTED STOOPS5'-0"20'-0"5'-0" <br />6'-0" <br />4"NOTE: REFER TO GRADING AND DRAINAGEPLAN FOR LIMITS OF SAND SUB-BASEFINISH GRADEAT EDGE OF STOOPFINISH GRADEOF PAVEMENT ADJACENTTO FOOTED STOOPSTOOP FOOTINGREFER TO STRUCTURALDRAWINGS6" DRAIN TILE (WHERE INDICATEDON DRAWINGS) - EXTEND TOSTORM SEWER STRUCTUREWHERE INDICATED ONDRAWINGSSUBGRADE SOILSSAND SUBBASEC2.138C2.1110FILTRATION AREACONSTRUCTION NOTESFILTRATION AREA CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING:1.FILTRATION AREA LIMITS SHALL BE SURVEYED AND A VISUAL BARRIER, SUCH AS ORANGE SNOW FENCE, SHALL BEPLACED AROUND THE FULL PERIMETER TO KEEP ALL CONSTRUCTION TRAFFIC, EQUIPMENT AND MATERIAL STOCKPILESOUT OF THE PROPOSED FILTRATION AREA. THE VISUAL BARRIER MUST BE INSTALLED BEFORE NEW CONSTRUCTIONBEGINS AND SHALL BE MAINTAINED THROUGH THE DURATION OF THE PROJECT.2.DELIVER SAMPLE MATERIALS ONSITE FOR PRIOR APPROVAL. PRIOR TO BEGINNING THE INSTALLATION, SUFFICIENTMATERIAL QUANTITIES SHALL BE ONSITE TO COMPLETE THE INSTALLATION AND STABILIZE EXPOSED SOIL AREASWITHOUT DELAY.3.CARE MUST BE TAKEN TO AVOID CONTAMINATION OF ENGINEERED SOILS WITH SEDIMENT, IN-SITU OR TOPSOIL DURINGAND AFTER INSTALLATION. MATERIALS MUST BE SEGREGATED.4.INSTALLATION WITH DRY SOIL CONDITIONS IS CRITICAL TO PREVENT SMEARING AND COMPACTION. SCHEDULE WORKFOR PERIODS OF DRY WEATHER. DO NOT WORK IF SOIL CONDITIONS ARE WET. EXCAVATION, SOIL PLACEMENT ANDRAPID STABILIZATION OF PERIMETER SLOPES WITH TURF SOD MUST COMPLETED BEFORE THE NEXT PRECIPITATIONEVENT. TURF SOD PLACED IN FLOW PATHS SHALL BE SECURED WITH AT LEAST 6 STAKES PER SQUARE YARD. PLACESTAKES ALONG UPHILL SEAM EDGES TO PREVENT UNDERMINING FLOWS UNTIL SOD ROOTS ESTABLISH.5.DO NOT LEAVE STORMWATER AREAS AND / OR PERIMETER SLOPES EXPOSED OVERNIGHT. SECURE THE SITE FROM RISKOF PRECIPITATION DAMAGES AT THE END OF EVERY WORK DAY. IN THE EVENT OF RAIN, TAKE ACTION TO DIVERTSTORMWATER AWAY FROM THE WORK AREA AND TEMPORARILY COVER OF ALL EXPOSED SOILS WITH FILTER FABRICOR IMPERMEABLE SHEETING.6.FIELD OBSERVATION OF EXCAVATION AND SOIL PLACEMENT IS REQUIRED. NOTIFY GEOTECHNICAL ENGINEER PRIOR TODIGGING. USE BACKHOE WITH TOOTH BUCKET FOR CELL EXCAVATION TO AVOID COMPACTING OR SMEARING OF SOILS.(DO NOT USE SKID STEER FOR EXCAVATION WITHIN THE CELL) USE TOOTH BUCKET TO SCARIFY (RIP) UNDERLYINGSOILS 6" TO 9" DEEP TO REMOVE COMPACTION. GENTLY MIX THE FIRST LIFT OF ENGINEERED SOILS WITH THE LOOSENEDUNDERLYING SOILS TO AVOID STRATIFICATION AND PROMOTE PERMEABILITY. USE EXCAVATOR BUCKET TO PLACEMATERIALS. CONSTRUCTION EQUIPMENT SHALL NOT BE ALLOWED INTO THE STORMWATER AREAS. LEVELING ANDFINAL GRADING WITHIN THE CELL MUST BE COMPLETED BY HAND.7.FILTRATION AREA SOIL MIX SHALL BE MINNESOTA STORMWATER MANUAL 4.1.2 MIX B: ENHANCED FILTRATION BLEND(WELL BLENDED MIXTURE OF 70% ASTM C-33 COARSE WASHED SAND (MN/DOT 3126) AND 30% MN/DOT 3890 GRADE 2LEAF LITTER COMPOST. THE MATERIAL SUPPLIER SHALL PROVIDE DOCUMENTATION THAT THE COMPOST HAS BEENSAMPLED AND TESTED AS REQUIRED BY THE SEAL OF TESTING ASSURANCE (STA) PROGRAM OF THE UNITED STATESCOMPOSTING COUNCIL (USCC) AND A GRADATION SIEVE ANALYSIS FOR THE WASHED SAND. THE ENGINEERED SOILSHALL NOT CONTAIN ANY TOPSOIL OR FILTER AGGREGATE WITH FINES.8.INSTALL PLANTINGS BY HAND.9.INSTALLED SOD AND PLANTINGS REQUIRE A TOTAL OF 1" OF WATER PER WEEK AND ACTIVE WEED MANAGEMENT UNTILWELL ESTABLISHED. WATERING COSTS ARE CONSIDERED INCIDENTAL TO SOD AND PLANTING INSTALLATION.CONSTRUCT A TEMPORARY IRRIGATION SYSTEM, CONSISTING OF ABOVE GROUND HEADS, PIPING, VALVES, ETC., FORWATERING UNTIL VEGETATION IS ESTABLISHED. DO NOT USE A WATER TRUCK AS THE FORCE OF THE WATER WILLADVERSELY AFFECT THE STORMWATER AREA SOILS.10.REMOVAL OF ACCUMULATED SEDIMENT AND DEBRIS SHALL BE DONE BY HAND OR, IF SELF-PROPELLED EQUIPMENT ISREQUIRED, FROM OUTSIDE THE PERIMETER OF THE FILTRATION AREAS.C2.1113GRADING - BELOW GRADEBUILDING WALLSBUILDING PAD(ENGINEERED FILL)11FINISH GRADE(TURF AREAS)FINISH FLOORELEVATIONBACKFILL ATBELOW GRADEWALLSFOOTING (REFER TOSTRUCTURAL PLANS)FINISH FLOOR ELEVATIONREFER TO ARCHITECTURALPLANS FOR VERIFICATION INLOWER LEVEL FINISH FLOORELEVATIONS AND LOCATIONSOF VARIATIONS2'-0"30°0'0"6"12" TOPSOIL OVER BACKFILL6" TOPSOILDetail NumberSheet NumberRIPRAP - FLARED ENDSECTIOND <br />515D2'-0" <br />D <br />5D12"PLANSECTION A - ASECTION B - B12" <br />18"BBAACLASS III RIPRAPGEOTEXTILE FABRICPLAN FINISH GRADECLASS III RIPRAPGEOTEXTILE FABRICPLAN FINISH GRADEFABRIC SHALL COVER THE AREAOF THE RIPRAP AND EXTENDUNDER THE CULVERT APRON 3'